<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>At the Intersection of Art, Architecture &#38; Design&#187; Ensuring Return Value For Your Remodeling Costs &#8211; At the Intersection of Art, Architecture &amp; Design</title>
	<atom:link href="http://www.braitmandesign.com/topics/cost-of-remodeling/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.braitmandesign.com</link>
	<description>Helping Homeowners turn their Existing Home into the Home of Their Dreams</description>
	<lastBuildDate>Fri, 30 Jul 2010 09:36:48 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Ensuring Return Value For Your Remodeling Costs</title>
		<link>http://www.braitmandesign.com/home-remodeling/ensuring-return-remodeling-costs/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/ensuring-return-remodeling-costs/#comments</comments>
		<pubDate>Mon, 15 Feb 2010 13:37:25 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/?p=1851</guid>
		<description><![CDATA[When you live in a place that fits you and your family to a tee, and that embodies your sense of beauty – you’re happier and healthier.  These 4 concepts will help you understand whether you'll get your investment back at resale.]]></description>
			<content:encoded><![CDATA[<p>Last Monday <a href="http://www.braitmandesign.com/home-remodeling/home-improvements-investment-2005-2009/" target="_blank">I reported</a> that, according to Remodeling Magazines’ Annual Cost to Value Report, you could only achieve about 50% &#8211; 75% return on most remodeling projects.  So why remodel?</p>
<p>For me the answer is simple – when you live in a place you love, that fits you and your family to a tee, and that embodies your sense of beauty – you’re both happier and healthier.  Only you can put the proper value on how much a given remodeling project will enhance your well being.</p>
<div id="attachment_1852" class="wp-caption alignnone" style="width: 535px"><img class="size-full wp-image-1852" title="Curb Appeal &amp; Maintenance Projects" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/Basta_EntryClose.jpg" alt="Curb Appeal &amp; Maintenance Projects" width="525" height="347" /><p class="wp-caption-text">Front Porch Stimulates Impromptu Coffee-Klatches With Neighbors</p></div>
<p>Using one of my clients as a case study, here are 4 concepts to keep in mind as you embark on making your existing home your dream home.</p>
<p><span style="text-decoration: underline;"><strong>1.    Home Maintenance and Repair.</strong></span> My client replaced dented, stained aluminum siding with fiber cement siding.  They also took the opportunity to blow insulation into wall cavities and add rigid foam insulation between the sheathing and the new siding.  The windows had been replaced some years before.  These improvements – according to the report – are good investments since they will reduce heating and cooling costs, make the home more comfortable and return more than 80% of their value.</p>
<div id="attachment_1853" class="wp-caption alignnone" style="width: 535px"><img class="size-full wp-image-1853" title="Siding &amp; Roofing Improvement Return Value" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/Basta_FrontAfter.jpg" alt="Siding &amp; Roofing Improvement Return Value" width="525" height="356" /><p class="wp-caption-text">Siding &amp; Roofing Improvement Return Value; Safe Steps Keep Mind On Home</p></div>
<p><span style="text-decoration: underline;"><strong><br />
2.    Curb Appeal and Neighborhood Interaction.</strong></span> My client added a full-length front porch that both dramatically changed the relationship of the home to the neighborhood but also improved the curb appeal by integrating and replacing diverse roof lines from previous additions.  Front landscaping and a new safer front stairs complete the front curb appeal.  Now, instead of being separated from the neighborhood, the homeowners have frequent impromptu coffee-klatches on the front porch with neighbors and friends.</p>
<p>Curb appeal projects are more typically low cost projects that can dramatically improve the appearance and appeal of your home.  Such projects might include painting, landscape improvements, or refreshing the kitchen or bath without major remodeling.  I try to help clients understand that doing these projects even if you aren’t planning to sell, can make a huge difference in the way you, your family and friends feel about your home.</p>
<p><span style="text-decoration: underline;"><strong>3.    Lifestyle Improvements.</strong></span> My clients, who regularly entertain both large and small groups, wanted a home that matched their lifestyle.  They also wanted to enlarge their home not with an addition but with a livable garden room.  A kitchen remodel combined with changes that created an open floor plan dramatically changed the way they live – dramatically improving their interaction as a couple and in their entertaining. Now meal preparation is a group activity even if only one person is in the kitchen.  Even relaxing is a joint activity instead of retreating to different parts of the house.  While it’s hard to put a value on the benefits, it’s easier to understand the high price of finding a new house to meet their needs and the disruption to their lives to move to a new neighborhood.   On this measure, the remodel pays for itself.</p>
<div id="attachment_1854" class="wp-caption alignnone" style="width: 535px"><img class="size-full wp-image-1854" title="Lifestyle Improvements - Open Floor Plan" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/Basta_KitchenMain.jpg" alt="Lifestyle Improvements - Open Floor Plan" width="525" height="359" /><p class="wp-caption-text">Lifestyle Improvements - Open Floor Plan</p></div>
<div id="attachment_1855" class="wp-caption alignnone" style="width: 535px"><img class="size-full wp-image-1855" title="Extend House with Garden Room Addition" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/Basta_BackAfter.jpg" alt="Extend House with Garden Room Addition" width="525" height="349" /><p class="wp-caption-text">Extend House with Garden Room Addition</p></div>
<p><span style="text-decoration: underline;"><strong>4.    Neighborhood Norms and Expectations.</strong></span> Neighborhoods are dramatically different as you travel through a city or across the country.  In some neighborhood, all the houses were built at the same time and from just a few different models.  In these neighborhoods, you’re not likely to recover remodeling costs that don’t stay within the neighborhood norms.  But if you stay within norms, you can often recover remodeling costs.  For example, maybe homes in your neighborhood typically have 2 full baths or a powder room on the first floor and your home does not.  In this case, bringing your home up to the established level of the neighborhood will usually pay off.  Similarly, if you’re selling – or hoping to sell – your home at the top of the market in your neighborhood, the buyer is going to expect the home to be in move-in condition with no addition work.  So if your basement is unfinished, finishing your basement will help your re-sale potential.  Such improvement will not only be important to your buyer but also to achieving an appropriately high appraisal.</p>
<p>However, I usually work in very mixed urban neighborhoods where prices might vary by more than 100% from one house to another.  On my own street, for example, one house sold recently for $900,000 while the one 3 houses down door went for $425,000.  If you own a home near the bottom of the range, you have a broad range of improvements you can make without pricing youself out of the market.  Of course, if you own a home near the top of the market, you might not be able to recoup any improvement costs.</p>
<p>With his remodeled interior and exterior, my client has probably priced his home at the top of the neighborhood values.  So when he sells, his market sales price probably won’t recover the full cost of the remodel.  On the other hand, the money not recovered will likely be less than the transaction costs (commission, closing fees, and moving costs) of moving to another home.  And we didn’t go completely overboard.  The husband wanted a fire-pit.  Rather than build an expensive stone fire-pit, we found a place for a modestly priced commercial model.</p>
<div id="attachment_1856" class="wp-caption alignnone" style="width: 535px"><img class="size-full wp-image-1856" title="Modest Fire-Pit" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/Basta_FirePit.jpg" alt="Modest Fire-Pit" width="525" height="500" /><p class="wp-caption-text">Modest Fire-Pit Responds to Lifestyle Dream Withou Breaking Budget</p></div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/ensuring-return-remodeling-costs/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Home Improvements as Investment – 2005 vs 2009</title>
		<link>http://www.braitmandesign.com/home-remodeling/home-improvements-investment-2005-2009/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/home-improvements-investment-2005-2009/#comments</comments>
		<pubDate>Mon, 08 Feb 2010 21:16:55 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/?p=1832</guid>
		<description><![CDATA[In 2005, during the height of the housing boom, you could recoup 90% to 100% of your cost for many home improvement activities.  And in hot areas – such as Washington, DC where I practice – you could recoup more than 100% of your cost on kitchen and bath remodeling as well as many outdoor rooms.  Today the picture is quite different; the national averages show few home improvements return more than 80% of their cost and most return between 60-70%.  ]]></description>
			<content:encoded><![CDATA[<div id="attachment_1833" class="wp-caption alignnone" style="width: 390px"><img class="size-full wp-image-1833" title="Remodeling Projects No Longer Have High ROI" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/43rdPorchAfter.jpg" alt="Remodeling Projects No Longer Have High ROI" width="380" height="255" /><p class="wp-caption-text">Remodeling Projects No Longer Necessarily Have High ROI</p></div>
<p>For the past 22 years, Remodeling Magazine has looked at the relationship between remodeling costs and resale value.  I’ve included a table, below, that compares the national averages for projects across regions for the years 2009, 2007, 2005, and 2003.  <a href="http://www.remodeling.hw.net/2009/costvsvalue/national.aspx" target="_blank">Find the 2009 Report Here.</a></p>
<p>In 2005, during the height of the housing boom, you could recoup 90% to 100% of your cost for many home improvement activities.  And in hot areas – such as Washington, DC where I practice – you could recoup more than 100% of your cost on kitchen and bath remodeling as well as many outdoor rooms.</p>
<p>Today the picture is quite different; the national averages show few home improvements return more than 80% of their cost and most return between 60-70%.</p>
<table id="table1" style="height: 732px;" border="0" cellspacing="0" cellpadding="0" width="532">
<colgroup>
<col width="24"></col>
<col width="23"></col>
<col width="240"></col>
<col width="64"></col>
<col width="74"></col>
<col span="2" width="68"></col>
<col width="64"></col>
</colgroup>
<tbody>
<tr height="38">
<td id="change_col" width="24" height="38"></td>
<td width="23"></td>
<td width="240"></td>
<td id="jobcost_col" width="64">2009<br />
Job Cost</td>
<td colspan="4" width="274">% of Cost Recouped at Resale</td>
</tr>
<tr height="22">
<td height="22"></td>
<td></td>
<td></td>
<td width="64"></td>
<td>2009</td>
<td>2007</td>
<td>2005</td>
<td width="64">2003</td>
</tr>
<tr height="22">
<td colspan="3" height="22"><span style="text-decoration: underline;"><strong>Mid-Range Projects</strong></span></td>
<td width="64"></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td colspan="2"><strong>Additions</strong></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Deck Addition (wood)</td>
<td width="64">$10,634</td>
<td width="74">81%</td>
<td width="68">85%</td>
<td width="68">90%</td>
<td width="64">104%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Deck Addition (composite)</td>
<td width="64">$15,373</td>
<td width="74">71%</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Two-Story Addition</td>
<td width="64">$156,309</td>
<td width="74">69%</td>
<td width="68">74%</td>
<td width="68">95%</td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Family Room Addition</td>
<td width="64">$82,756</td>
<td width="74">65%</td>
<td width="68">69%</td>
<td width="68">83%</td>
<td width="64">81%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Master Suite Addition</td>
<td width="64">$103,696</td>
<td width="74">65%</td>
<td width="68">69%</td>
<td width="68">82%</td>
<td width="64">76%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Garage Addition</td>
<td width="64">$58,432</td>
<td width="74">62%</td>
<td width="68">70%</td>
<td width="68"></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Bathroom Addition</td>
<td width="64">$39,046</td>
<td width="74">60%</td>
<td width="68">66%</td>
<td width="68">86%</td>
<td width="64">95%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Backup Power Generator</td>
<td width="64">$14,304</td>
<td width="74">59%</td>
<td width="68">58%</td>
<td width="68"></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Sunroom Addition</td>
<td width="64">$73,167</td>
<td width="74">51%</td>
<td width="68">59%</td>
<td width="68">75%</td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td colspan="2"><strong>Remodeling</strong></td>
<td width="64"></td>
<td width="74"></td>
<td width="68"></td>
<td width="68"></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Attic Bedroom</td>
<td width="64">$49,346</td>
<td width="74">83%</td>
<td width="68">77%</td>
<td width="68">94%</td>
<td width="64">93%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Minor Kitchen Remodel</td>
<td width="64">$21,411</td>
<td width="74">78%</td>
<td width="68">83%</td>
<td width="68">99%</td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Basement Remodel</td>
<td width="64">$62,067</td>
<td width="74">75%</td>
<td width="68">75%</td>
<td width="68">90%</td>
<td width="64">79%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Major Kitchen Remodel</td>
<td width="64">$57,215</td>
<td width="74">72%</td>
<td width="68">78%</td>
<td width="68">91%</td>
<td width="64">75%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Bathroom Remodel</td>
<td width="64">$16,142</td>
<td width="74">71%</td>
<td width="68">78%</td>
<td width="68">102%</td>
<td width="64">89%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Home Office Remodel</td>
<td width="64">$28,375</td>
<td width="74">48%</td>
<td width="68">57%</td>
<td width="68">73%</td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td colspan="2"><strong>Replacement</strong></td>
<td width="64"></td>
<td width="74"></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Siding Replacement (vinyl)</td>
<td width="64">$10,607</td>
<td width="74">80%</td>
<td width="68">83%</td>
<td width="68">96%</td>
<td width="64">98%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Window Replacement (wood)</td>
<td width="64">$11,700</td>
<td width="74">77%</td>
<td width="68">81%</td>
<td width="68">90%</td>
<td width="64">85%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Window Replacement (vinyl)</td>
<td width="64">$10,728</td>
<td width="74">77%</td>
<td width="68">79%</td>
<td width="68"></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Roofing Replacement</td>
<td width="64">$19,731</td>
<td width="74">67%</td>
<td width="68">67%</td>
<td width="68">85%</td>
<td></td>
</tr>
<tr height="21">
<td colspan="3" width="287" height="21"><span style="text-decoration: underline;"><strong>Upscale Projects</strong></span></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr height="20">
<td width="24" height="20"></td>
<td colspan="2"><strong>Additions</strong></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Master Suite Addition</td>
<td width="64">$225,995</td>
<td width="74">56%</td>
<td width="68">64%</td>
<td width="68">80%</td>
<td width="64">77%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Garage Addition</td>
<td width="64">$87,230</td>
<td width="74">56%</td>
<td width="68">65%</td>
<td width="68"></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Bathroom Addition</td>
<td width="64">$75,812</td>
<td width="74">58%</td>
<td width="68">69%</td>
<td width="68">86%</td>
<td width="64">84%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Deck Addition (composite)</td>
<td width="64">$37,745</td>
<td width="74">61%</td>
<td width="68">78%</td>
<td width="68"></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td colspan="2"><strong>Remodeling</strong></td>
<td width="64"></td>
<td width="74"></td>
<td width="68"></td>
<td width="68"></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Major Kitchen Remodel</td>
<td width="64">$111,794</td>
<td width="74">63%</td>
<td width="68">74%</td>
<td width="68">85%</td>
<td width="64">80%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Bathroom Remodel</td>
<td width="64">$52,295</td>
<td width="74">62%</td>
<td width="68">68%</td>
<td width="68">93%</td>
<td width="64">93%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td colspan="2"><strong>Replacement</strong></td>
<td width="64"></td>
<td width="74"></td>
<td width="68"></td>
<td width="68"></td>
<td width="64"></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Roofing Replacement</td>
<td width="64">$37,359</td>
<td width="74">61%</td>
<td width="68">66%</td>
<td width="68">86%</td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Window Replacement (wood)</td>
<td width="64">$17,816</td>
<td width="74">72%</td>
<td width="68">79%</td>
<td width="68">89%</td>
<td width="64">87%</td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Window Replacement (vinyl)</td>
<td width="64">$13,862</td>
<td width="74">77%</td>
<td width="68">81%</td>
<td width="68"></td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Siding Replacement (fiber-cement)</td>
<td width="64">$13,287</td>
<td width="74">84%</td>
<td width="68">88%</td>
<td width="68">104%</td>
<td></td>
</tr>
<tr height="17">
<td height="17"></td>
<td></td>
<td>Siding Replacement (foam-backed vinyl)</td>
<td width="64">$13,022</td>
<td width="74">79%</td>
<td width="68">80%</td>
<td width="68"></td>
<td></td>
</tr>
</tbody>
</table>
<p>It’s also clear that we’re thinking more modestly about our homes and looking for home improvement projects to return other benefits – so the return on siding and window replacement, while declining, have held more steady than have bath or kitchen remodeling.</p>
<p>Bathroom remodeling – whether mid-range or upscale, mid-range or upscale – have lost between 27% and 30% of the return from just 4 years ago.  However, Wood decks, window and siding replacement have retained much more of their resale value since 2005 than have other improvement activities.</p>
<p>When you’re thinking of remodeling it’s important to understand how much value your investment is likely to return – but few of us make our decisions based only on return on investment.  Moreover, the numbers here are national averages.  It does not speak to your specific circumstance.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/home-improvements-investment-2005-2009/feed/</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>When is a bump-out really an Addition?</title>
		<link>http://www.braitmandesign.com/home-remodeling/bumpout-addition/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/bumpout-addition/#comments</comments>
		<pubDate>Fri, 05 Feb 2010 17:50:52 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Creating Space]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/?p=1826</guid>
		<description><![CDATA[I got a question recently on a post about Remodeling Price Drivers asking:
“When is a bump out no longer a bump out but rather an addition?  And when doing a cost estimate, is the cost of a bump out the same as an addition, approximately $200 per square foot?”
The short answer is that, for all [...]]]></description>
			<content:encoded><![CDATA[<p>I got a question recently on a post about <a href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/">Remodeling Price Drivers</a> asking:</p>
<p>“When is a bump out no longer a bump out but rather an addition?  And when doing a cost estimate, is the cost of a bump out the same as an addition, approximately $200 per square foot?”</p>
<p>The short answer is that, for all practical purposes, a bump-out might cost even more than $200/sf.  This is because the bumped out area still requires support and roofing and might require HVAC and other systems.  For example bumping out a wall to create a dining nook might only be 3’ deep and 10’ wide – or 30 square feet.  It might cost $10,000 to properly support and roof the system plus to add windows and lighting.  This would be over $300/sf.</p>
<p>This is the problem with ballpark pricing &#8212; without knowing the details it’s hard to provide guidance.  In general, very small areas and areas requiring specialized systems or materials (baths, kitchens, etc.) cost more than the average.</p>
<p>The term “bump-out” is, at best, a term of art.  Generally, bump-outs refer to situations when a single wall or portion of a wall is extended a few feet.  While the space gain might be negligible, the effect can be powerful.  A bump-out can transform a flat wall into one of great architectural interest &#8212; for example, giving focus to a dining nook.  The whole table need not fit in the bump-out but by the pattern of windows or even just by the existing of a slight off-set, the dining nook can take center stage (see rendering below).</p>
<div id="attachment_1827" class="wp-caption alignnone" style="width: 535px"><img class="size-full wp-image-1827" title="Bumped Out Dining Nook" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/Bump-out_DN.jpg" alt="Bumped Out Dining Nook" width="525" height="335" /><p class="wp-caption-text">Bumped Out Dining Nook</p></div>
<p>In the kitchen, below, one wall was bumped out 5 ft which allowed us to greatly improve the traffic flow and to include a u-shaped kitchen off the family room.</p>
<div id="attachment_1828" class="wp-caption alignnone" style="width: 535px"><img class="size-full wp-image-1828" title="WillowKitchen_frmFamily" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/WillowKitchen_frmFamily.jpg" alt="Kitchen Bump-out" width="525" height="309" /><p class="wp-caption-text">5&#39; Deep Kitchen Bump-out</p></div>
<p>However, both of these “bump-out” are in fact additions.  They require foundations or other support, roofs, HVAC and all the other systems required by an addition – albeit a small one.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/bumpout-addition/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>How to Avoid Breaking the Remodeling Budget</title>
		<link>http://www.braitmandesign.com/home-remodeling/avoid-remodeling-budget-pitfalls/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/avoid-remodeling-budget-pitfalls/#comments</comments>
		<pubDate>Mon, 01 Feb 2010 14:51:20 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>
		<category><![CDATA[The Remodeling Process]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/?p=1805</guid>
		<description><![CDATA[How to avoid financial pitfalls in home remodeling - part 1]]></description>
			<content:encoded><![CDATA[<p>In my experience, homeowners experience 4 different types of bad experiences during and after a major remodel project:</p>
<ol>
<li>Financial &#8211; The actual costs are much greater than the anticipated costs</li>
<li>Financial &#8211; They invest more money than they can get out during resale</li>
<li>Problems with Contractors</li>
<li> Style/Look – When it’s completed, there are certain areas or items that they’re not satisfied with.</li>
<li> Function &#8211; Don’t like way certain areas or items function</li>
</ol>
<div id="attachment_1809" class="wp-caption alignnone" style="width: 516px"><img class="size-full wp-image-1809" title="Successful Home Remodeling" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/43rdSunRoom_LG.jpg" alt="Successful Home Remodeling" width="506" height="648" /><p class="wp-caption-text">Successful Home Remodeling</p></div>
<p>And many of these areas overlap – For example, a contractor makes a decision on his own without asking about placement of an appliance or cabinet and the homeowner doesn’t like the result.</p>
<p>In this series of articles (on successive Mondays), we’ll address each of these area starting today with Financial Pitfalls – Costs Exceed Budget</p>
<p><span style="text-decoration: underline;"><strong>Pitfall:  Actual Costs are Greater Than Anticipated: </strong></span></p>
<p><span style="text-decoration: underline;"><strong>Planning:</strong></span> The planning for a remodeling project must be extraordinarily comprehensive because even small details can have big price tags.  I got a question recently from a homeowner living in Pennsylvania saying that she wanted to do an attic remodel and got a ballpark from a contractor of $200/sf for the remodel  She wanted to know if that was reasonable.  It certainly is a starting point.  In the area I work – the greater Washington DC area – the price for an attic remodel could range from $100/sf to $250/sf.  For a 1000 sf attic, that’s a price range of $100,000 to $250,000.  Not a good basis for any planning except whether it’s even worth planning further.  Similarly, even for the exact same floor plan, I can’t give much closer a price range without having worked through the details.  Let me give just a few examples: a kitchen with laminate counters can cost $5,000 less than a kitchen with the same square feet of granite counters.  I can spend anywhere from $4,000 to $20,000 for appliances for the same size kitchen.  I can spend $1,000 to $6,000 on flooring.  And lighting can be anywhere from $1,000 to $15,000 for the same area.  A single sink can be anywhere from $100 t0 $1,200.  And the list goes on.  When I work with a client, I start with the ballpark only so they can figure out whether to continue.  Then I work on a floor plan with the functionality that they need.  And then we start working on the details WITH THEIR BUDGET IN MIND.</p>
<p><span style="text-decoration: underline;"><strong>Compromise: </strong></span>With the basic goal in hand in the form of a floorplan and wishlist of specifications, we can then start to plan the specifics.  For most homeowners this means identifying specific compromises to get close to their goals within their budget.  I usually present a detailed budget that meets their budget and one that contains their full set of desires.  Sometimes these can be tens of thousands of dollars apart.  Then we start compromising.  Maybe some items are so important that it’s worth increasing their budget.  Some high priced items are jettisoned (maybe that higher priced stove or dishwasher or specialty cabinets) for lower priced items in order to stay in the budget.  Or maybe the project is phased so that they get it all – just not all at once.</p>
<p><span style="text-decoration: underline;"><strong>Execution: </strong></span>The other reason for detailed planning is that a change at the planning stage is incredibly cheaper than a change-order after the job starts.  I always include 10%-25% contingency in the budget to take account of inevitable unexpected items when the walls are opened up and the equally inevitable “while you’re here” requests.  That’s why my projects almost never exceed the budget.  But when you don’t do detailed planning up-front, the costs can exceed the budget by 50% or even 100% because it’s costly to change plans in the middle of the project.  The costs of change come from</p>
<p><span style="text-decoration: underline;"><strong>For further reading:</strong></span></p>
<p>-    <a href="http://www.braitmandesign.com/home-remodeling/budgeting-for-a-remodeling-project/" target="_self"> Budgeting for a Remodeling Project</a><br />
-    <a href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cut-20000-dollars-out-of-85000-dollar-kitchen-remodel/">How to cut $20,000 Out of A $85,000 Kitchen Remodel</a><br />
-    <a href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/">What Does it Cost to Remodel a kitchen?</a><br />
-    <a href="http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/">8 Way to Keep Kitchen Remodeling Costs Down</a><br />
-    <a href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/">Price Drivers in Residential Remodeling</a><br />
-    <a href="http://www.braitmandesign.com/home-remodeling/budgeting-for-a-remodeling-project/">Budgeting for a Remodeling Project</a><br />
-    <a href="http://www.braitmandesign.com/home-remodeling/basement-remodeling-cost-components/">Basement Remodeling – Cost Components</a><br />
-    <a href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/low-cost-kitchen-remodel/">A Low-Cost Kitchen Remodel</a><br />
-    <a href="http://www.braitmandesign.com/home-remodeling/you-control-remodeling-costs-%E2%80%93-whether-you-know-it-or-not/">You control remodeling costs</a><br />
-    <a href="http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/">Comparing Price Estimates – Make Sure It’s Apples to Apples</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/avoid-remodeling-budget-pitfalls/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Comparing Contractor Estimates &#8211; Part 1</title>
		<link>http://www.braitmandesign.com/home-remodeling/comparing-contractor-estimates/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/comparing-contractor-estimates/#comments</comments>
		<pubDate>Mon, 07 Dec 2009 23:27:21 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Working with Contractors]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1618</guid>
		<description><![CDATA[It's frustrating -- to say the least--  when you receive wildly different price quotes for what you think is the same work. This article is about how to compare estimates when you’ve provided the contractor a drawing of what you want. ]]></description>
			<content:encoded><![CDATA[<div id="attachment_1619" class="wp-caption alignnone" style="width: 394px"><a href="http://www.braitmandesign.com/blog/wp-content/uploads/2009/12/StoneTerrace03.jpg"><img class="size-full wp-image-1619" title="StoneTerrace03" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/12/StoneTerrace03.jpg" alt="Comparing Prices on a Stone Terrace" width="384" height="255" /></a><p class="wp-caption-text">Comparing Prices on a Stone Terrace</p></div>
<p>One of the most frustrating experiences for a homeowner looking to do work on their home is to get estimates that differ wildly in price – especially when all the contractors are recommended by friends or neighbors.  This article is about how to compare the estimates when you’ve provided the contractor a drawing of what you want.  In a future article, we’ll talk about the more complicated situation where you haven’t provided a drawing.</p>
<p>In my experience, the primary reason that contractor estimates differ by a third, 50% or even 100% is that the scope quoted is dramatically different.  Contractors, small contractors in particular, will often provide a sentence or bullet points about what’s included.  But often fail to spell out clearly how they’ll do the job, what is being done by others, and what allowances or assumptions they’ve made.</p>
<p>I recently designed a basement media room including a wet bar.  The total price I quoted after the design was approved was $45,000.  The price was based on estimates from subcontractors on individual components including demolition, construction, plumbing, electrical, tiling, painting, installation of the new media equipment, plus my time for construction management and a 10% contingency.  The contingency, of course, would only be used if necessary.</p>
<p>Having been a client of home improvement contractors long before I ever became a contractor, my philosophy is a bit different from most contractors.  As the client I did not want cost surprises at the end of the job.  If I was told the job was going to cost $30,000, I didn’t want to end up paying $35,000 let alone $45,000.  So when I do job costing, I use assumptions – often called allowances – based on the client’s actual tastes and not assuming “builder” grade materials.  I also always include at least 10% contingency and often 15% to 20% contingency depending on the job and the age and general condition of the house.</p>
<p>My business model is different in another way from most design/build firms in that I separate the design and build phases.  Clients are free to take my design to others for bid.  That’s what this client did; he took the design to a carpenter he’s used in the past and got a quote of $20,000.  He asked me to talk with this other contractor to see if the lower bid made sense to take.</p>
<p>While at first blush it seemed like the homeowner could save a lot of money by using the other contractor, it turns out that the carpenter was really bidding only on the part of the job that he was comfortable doing – the demolition, construction, and tiling.  The bid did not include plumbing, electrical, electronics, painting, or construction management.  In addition, the carpenter assumed that the homeowner would purchase all the decorative items like tile, carpet, plumbing fixtures, drawer pulls, and so on.  And, of course, there was no provision for contingency.  When we added back in the other trades, the cost of materials, and the contingency, the difference in the bids was about $3,500.</p>
<p>When I asked the homeowner whether he was interested in performing the construction management role – sourcing and ordering materials, hiring and scheduling subcontractors, he indicated that he did not have time and wanted me to play that role.  When we added back in this time, the actual “bid” was just slightly higher than my original bid.  But the homeowner still wanted to use contractors that he had used before so I kept the build contract but subcontracted to the carpenter with whom the homeowner was already familiar.</p>
<p>When you have a good vision of what you want – and you share that vision clearly with a drawing – to contractors, the difference in price has to come down to 3 things:<br />
<span style="text-decoration: underline;"><strong><br />
1.    Scope:</strong></span> A likely source of price differences comes from differences in scope.</p>
<p><span style="text-decoration: underline;">Proportion of the full Job:</span> When you get a quote that excludes portions of the full scope, you can’t evaluate that estimate until you also get estimates for all the work excluded.  Plus you need to think about whether you want to be in the position of construction management where you need to hire multiple trades and determine the appropriate sequence of work.</p>
<p><span style="text-decoration: underline;">Construction Approach:</span> Sometimes contractors will go about building the same thing differently.  I built a “stone” patio for a client where I used an underlayment to separate the movement of the deck from the stone tile.  I also “overbuilt” the deck to limit the amount of movement.  Another contractor could have produced the same look with less caution about making sure the stone tile didn’t crack.   My approach took more time and materials and therefore more money than another contractor might have charged.</p>
<p>You may need to ask sufficient questions about the construction process to identify that the approach is different and why each contractor is taking the approach they’re taking.  Ultimately, you’ll need to exercise judgment about whether the extra precautions taken by one contractor are “worth” the additional price.  Often the differences in construction approach are only noticeable in months or years as the work “wears” differently.</p>
<p><span style="text-decoration: underline;"><strong>2.    Materials:</strong></span> Another source of price difference comes from either actual differences in material costs or assumed differences in material costs.</p>
<p>Allowances &amp; Mark-ups:  Sometimes a contractor will include “builder grade” allowances for fixtures and materials in order to keep the estimate appearing low – even if they know that the client is likely to want to purchase more costly materials.  Material costs can add up to over 50% of the cost of the job.  So look closely at the contractors assumptions or allowances about material costs and how much the contractor “marks up” material costs.</p>
<p>Material Quality:  Most of us know that cedar decking costs more than pressure treated decking.  But there are lots of other less obvious material choices that can affect total price, maintenance, and longevity.  Staying with deck building, the price of galvanized hardware is considerably less than stainless steel hardware.  The price of azek bandboard is more expensive than pressure treated but requires less maintenance over time.</p>
<p><span style="text-decoration: underline;"><strong>3.    Labor Rates &amp; Business Model:</strong></span> If scope and materials are the same, the only other variable is labor.  Labor costs can differ either because one company charges more (or less) for the same work or because a company is also charging for additional supervisory or overhead time.  In my experience, there are 3 tiers in the remodeling business.  At the top are mid-sized construction or design/build companies.  Overall, their labor is often more expensive because the wage rate they charge for construction workers must also cover overhead and supervisory time.  On the other hand, they are often more able to respond quickly and can provide full-service including sourcing of materials and design assistance.  At the next tier are very small companies where management and labor is the same person – it’s one or two guys who quote the work, plan what to do, and perform the work.  These are US-born men or women who work for themselves and who are putting kids through college and saving toward retirement.  Their wage rate reflects a middle-class vision of themselves.    The next level are also very small firms but they are often foreign-born workers whose wage level keeps a roof over head and food on the table but who might not be saving for college or paying a mortgage.  All 3 models can produce identical work for differing costs.  However, the homeowner is sometimes required to know more and to take on more of the sourcing and management when using the the 2nd and 3rd business models described here.</p>
<p>I strongly advise homeowners when faced with widely divergent price bids to take the time to figure out what’s driving the difference.  If the difference is in scope or materials, you will either end up with something different than you expected or will end up paying more than the low quote implies.  Either result will be very frustrating.  If the difference is in labor rates and business model, then you need to consider what’s being expected of you in terms of sourcing or construction management and whether you’re prepared to undertake these additional burdens.</p>
<p>It’s absolutely true that you can find terrific workers who charge a fraction of what larger companies charge for the same work.  I routinely use a mason who does work for about 1/3 less than larger masonry companies.  In exchange for the less expensive – but exquisite – results, I have to secure the permits myself, to keep a flexible schedule since the owner is not good at communicating work schedule, and I often have to use hand-signals or find a friend who speaks Spanish to communicate nuances of what’s wanted.  The product though is as good as I’ve seen in this area.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/comparing-contractor-estimates/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>What Does it Cost to Remodel a kitchen?</title>
		<link>http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/</link>
		<comments>http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/#comments</comments>
		<pubDate>Thu, 15 Oct 2009 21:27:12 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Kitchen Remodeling]]></category>
		<category><![CDATA[Kitchens & Baths]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[Cabinets]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Modernizing Older Homes]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1387</guid>
		<description><![CDATA[What does it cost to renovate a kitchen?  I’ve had 3-4 contacts within the past few weeks from homeowners who wish to renovate their kitchens for budgets ranging from $15,000 to $25,000.  In their words, they want to gut their kitchens and replace everything from cabinets to lighting to flooring.]]></description>
			<content:encoded><![CDATA[<div id="attachment_1390" class="wp-caption alignnone" style="width: 510px"><a rel="attachment wp-att-1390" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/parkcrest_kitchen525-2/"><img class="size-full wp-image-1390" title="ParkCrest_Kitchen525" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/ParkCrest_Kitchen525.jpg" alt="Kitchen #1" width="500" height="332" /></a><p class="wp-caption-text">Kitchen #1</p></div>
<p>What does it cost to renovate a kitchen?  I’ve had 3-4 contacts within the past few weeks from homeowners who wish to renovate their kitchens for budgets ranging from $15,000 to $25,000.  In their words, they want to gut their kitchens and replace everything from cabinets to lighting to flooring.</p>
<p>My short answer to each of them was that I can’t do it for that money – and believe that it’s only possible if they’re willing to take on some of the tasks themselves – including my roles of design and construction management.</p>
<p>But it got me thinking about what drives the cost of kitchen remodeling.  Here are the actual costs for 4 very different kitchens that we’ve done recently:</p>
<div id="attachment_1391" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1391" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/4kitchens/"><img class="size-full wp-image-1391" title="4Kitchens" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/4Kitchens.jpg" alt="Cost Comparisons for 4 Kitchens" width="525" height="296" /></a><p class="wp-caption-text">Cost Comparisons for 4 Kitchens</p></div>
<p>The first 3 are nice but modest kitchens.  While the 4<sup>th</sup> is clearly high-end – but is still more modest than what is usually depicted in the glossy magazines.  Homeowner 1 &amp; 2 also reduced costs by doing some of the work themselves as I describe below.  All four kitchens are in the greater Washington DC area and all were remodeled during the 2007-2009 time period.  Three were in the close-in Maryland suburbs of Silver Spring, Takoma Park, and Bethesda.  One was in Upper Northwest Washington.  The prices &#8212; especially construction labor &#8212; will vary by region of the country.</p>
<div id="attachment_1392" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1392" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/willowkitchen_frmfamily-2/"><img class="size-full wp-image-1392" title="WillowKitchen_frmFamily" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/WillowKitchen_frmFamily.jpg" alt="Kitchen #2" width="525" height="309" /></a><p class="wp-caption-text">Kitchen #2</p></div>
<p>Construction labor drives kitchen remodeling costs.  It takes skilled labor to handle the very diverse tasks that are required to fix and modify wiring, plumbing, flooring, and to hang cabinets so that they are level and secure.  Construction labor accounted for 40% to 50% of the total costs of the remodel.  The labor required to design, source materials, and manage construction accounted for another 15% to 20% of the total cost.  If the homeowner can take over some of these high-cost items, overall remodeling costs can be greatly reduced!  In my experience, the tasks that homeowners are most likely to be comfortable performing including design, selecting and purchasing materials, project management, painting and tiling.  A homeowner willing to take on one or more of these tasks might be able to remodel a kitchen for $25,000 – if they are also willing to make some accommodations regarding material choices AND the keep the kitchen configuration pretty much unchanged!</p>
<p>The homeowner for kitchen 1 did the painting themselves; the homeowners for kitchen 2 tiled the floor themselves plus (an artist) created the glass art windows &amp; backsplash.  Both homeowners did some of the material sourcing themselves.</p>
<p>Changes that drive up both material and construction costs include opening up the kitchen to the rest of the house and to the outdoors – something that literally every single one of my clients desires.</p>
<p>The reason that construction costs seem to remain about 40-50% of total costs is that as more materials are added – such as windows and skylights or more complex plumbing and lighting – the cost of construction increases in order to properly install these additional features.</p>
<div id="attachment_1396" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1396" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/basta_kitchenmain-3/"><img class="size-full wp-image-1396" title="Basta_KitchenMain" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/Basta_KitchenMain.jpg" alt="Kitchen #3" width="525" height="359" /></a><p class="wp-caption-text">Kitchen #3</p></div>
<p>So now let’s look at how to control the 40% to 50% of costs that are paid for materials.</p>
<p><strong><span style="text-decoration: underline;">Cabinetry Drives Costs</span></strong>:  In all 4 kitchens, cabinetry was the highest price item accounting for 15% to 17% of the total budget.  And, in my opinion, it’s one area where you should pay for quality and function.  If we look at the first kitchen, we could have lowered the cabinetry costs by perhaps $2,000 by purchasing cabinets made with particle board frames and with doors instead of drawers in base cabinets.  But penny-pinching in this area can lead to cabinets that fall apart quickly and back strain and inconvenience.  All but the 4<sup>th</sup> kitchen used stock cabinetry and even the 4<sup>th</sup> kitchen only used certain specialty cabinetry.  None used cabinet fronts for appliances.  Custom cabinetry and finishes would have driven the costs of cabinets for the high-end kitchen up as much as $10-$20,000 (or more).</p>
<p>Kitchens 1 &amp; 2 kept cabinets costs low simply by limiting the amount of cabinets.  Both kitchens used closet pantries to eliminate several thousand in cabinet costs.  Building walls is much cheaper than buying cabinets.  A pantry can use ventilated or solid shelving at a fraction of the cost and with much great convenience than using large pantry cabinets.</p>
<p>IF your cabinets are in good shape, you can save half the cost of new cabinets by re-facing the cabinets instead of replacing them.  An even better way to save money if all you’re trying to do is change the look is to paint or stain the cabinets.  For one client, we spent only $1,000 to sand and re-stain the cabinets a very dark cherry color.  This totally changed the look of the kitchen.</p>
<p><strong><span style="text-decoration: underline;">Appliances &amp; Countertops</span></strong>:  These 2 categories account for 10% to 16% of costs.  Here is definitely an area where one can save without sacrificing function.  Using laminate instead of granite, concrete or solid surface material would have reduced the countertop costs by at least 75% &#8212; $2,000 to $7,000 savings!  And today’s laminates are much improved in performance and looks from the Formica of the 1950’s.</p>
<p>Believe it or not, all of these kitchens could have spent much more on appliances than they did.  Even the high-end kitchen used a standard depth refrigerator instead of a counter-depth built-in refrigerator.  The first 2 kitchens used ranges instead of cooktops with separate built-in ovens.  This is definitely an area where homeowners can save money without sacrificing a lot of function or looks.</p>
<p><strong><span style="text-decoration: underline;">Windows, Doors &amp;  Skylights:</span> </strong>All the Kitchens were opened to the rest of the house.  Kitchens 2, 3, and 4 were all opened up to the outdoors as well.  This added anywhere from $2,000 to $18,000 in material costs alone – and even more in labor.  Again, in my opinion, these costs are well worth the improvements in lifestyle and enjoyment.  Something that may be worth postponing your kitchen remodel until you can afford.</p>
<div id="attachment_1397" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1397" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/allen_kitchen02-2/"><img class="size-full wp-image-1397" title="Allen_Kitchen02" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/Allen_Kitchen02.jpg" alt="Partial View of Kitchen #4" width="525" height="350" /></a><p class="wp-caption-text">Partial View of Kitchen #4</p></div>
<p><strong><span style="text-decoration: underline;">Flooring:</span> </strong> The cost of flooring has a lot to do with the material and the detail. All of these homeowners kept costs relatively low – the 1<sup>st</sup>, 3<sup>rd</sup> and 4<sup>th</sup> all used hardwood and the cost differences have to do with how much of the flooring was new and the size of the space.  The 2<sup>nd</sup> kitchen used tile.  The cost reflects only the cost of the material since the homeowner saved money by doing installation themselves.  They also selected very attractive but low cost porcelain tile.  None of the homeowners used special inlays or patterns that would have jacked up the price.</p>
<p><strong><span style="text-decoration: underline;">Backsplash:</span></strong> Here’s an area where you can make a lot of impact with a low cost.</p>
<p><strong><span style="text-decoration: underline;">All the Rest:</span> </strong>Lighting fixtures and plumbing fixtures were costly in the 4<sup>th</sup> kitchen but quite modest in the other 3.  This area, in my opinion, is kind of like appliances where you can get a lot of function for a relatively inexpensive price.  Bells and Whistles and designer brands add a lot of price with only.</p>
<p><strong><span style="text-decoration: underline;">Summary:</span></strong> If you’re trying to get a sense of how much it will cost to “completely” remodel your kitchen, I would use the following ballpark formulas.  This will give you a reasonable sense of what it will take.  Then you can use the guidance, above, to think through how to keep the remodel costs as low as reasonably achievable.  Remember, these numbers are for the greater Washington DC area.  Prices &#8212; especially construction labor &#8212; will vary in different parts of the country.</p>
<table border="0" cellspacing="0" cellpadding="0">
<tbody>
<tr>
<td width="451" valign="top">If you’re keeping the existing configuration with no   changes to walls or functions.</td>
<td width="108" valign="top">$300 &#8211; $325/sf</td>
</tr>
<tr>
<td width="451" valign="top">If you’re opening up to the rest of the house</td>
<td width="108" valign="top">$325 &#8211; $400/sf</td>
</tr>
<tr>
<td width="451" valign="top">If you’re opening up to the house &amp; to the outside</td>
<td width="108" valign="top">$350 &#8211; $450/sf</td>
</tr>
<tr>
<td width="451" valign="top">If you want a designer kitchen</td>
<td width="108" valign="top">$450 &#8211; $650/sf</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/feed/</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>Comparing Price Estimates &#8211; Make Sure It&#8217;s Apples to Apples</title>
		<link>http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/#comments</comments>
		<pubDate>Mon, 18 May 2009 23:42:27 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[Basement Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>
		<category><![CDATA[The Remodeling Process]]></category>
		<category><![CDATA[Working with Contractors]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1199</guid>
		<description><![CDATA[This blog is half rant and half advice about how to evaluate bids from remodeling contractors.]]></description>
			<content:encoded><![CDATA[<div class="post even">
<table id="table1" style="border-style: solid; border-width: 0" border="0" cellspacing="4" cellpadding="4">
<tbody>
<tr>
<td></td>
</tr>
<tr>
<td>
<div id="attachment_1209" class="wp-caption alignnone" style="width: 507px"><a rel="attachment wp-att-1209" href="http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/attachment/changeorder1/"><img class="size-full wp-image-1209" title="changeorder1" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/changeorder1.jpg" alt="Accurate Contract Scope Keep Change Orders To a Minimum" width="497" height="400" /></a><p class="wp-caption-text">Accurate Contract Scope Keep Change Orders To a Minimum</p></div>
<p>This blog is half rant and half advice about how to evaluate bids from remodeling contractors.</td>
</tr>
<tr>
<td>About 9 months ago I lost a job for a basement remodel on &#8220;price&#8221;.  The winning contractor came in with a fixed price of $33,000 based on a brief discussion with the client.  My firm separates design and construction and the client liked what they heard from us and our references so they went ahead with us to do design (this is after they got the fixed price quote, mentioned above).  After a fairly detailed design, I gave the client an estimated price of $53,000.  Not surprisingly, the client thought the $33,000 was more attractive and went with the other firm.  When I heard that another contractor had bid $33,000, I was quite surprised and suspected that the difference reflected a different scope and not real construction price differences.  I tried to have a conversation with my client about whether the scope was the same but the client saw only the bottom line.</td>
</tr>
<tr>
<td>I thought I had developed a fairly good relationship with the client so decided to check in after the job was scheduled for completion.  I just called.  Here&#8217;s what I learned</td>
</tr>
<tr>
<td style="padding-top: 10px">
<table id="table2" style="border-width: 0pt; text-align: left;" border="0" cellspacing="5" cellpadding="5" width="100%">
<tbody>
<tr>
<td style="vertical-align: top; text-align: center;" width="24">1</td>
<td>The job took 2 months longer than expected.</td>
</tr>
<tr>
<td style="vertical-align: top; text-align: center;" width="24">2</td>
<td>The final job costs were $50,700 &#8212; a whopping 54% over-budget.  Note that we included $5,000 for contingency (not included by the other firm) so the total costs were almost exactly the same.  Plus we have a record of coming in on-budget based on detailed up-front budgeting.</td>
</tr>
<tr>
<td style="vertical-align: top; text-align: center;" width="24">3</td>
<td>Change-orders included the following items:</p>
<table id="table3" border="0" width="100%">
<tbody>
<tr>
<td width="24" align="center">-</td>
<td>The bath location had to be moved to the location we suggested</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>Lighting was upgraded to recessed lighting (included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>The inspector required them to include an egress window (included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>HVAC was upgraded (included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>Finish allowances were exceeded by 500% (upgraded finishes were included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>Additional walls were constructed (included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>Additional labor for removing and reinstalling bookcases and other case goods (included in our initial quote)</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td style="vertical-align: top; text-align: center;" width="24">4</td>
<td>The client was furious about the job.  They didn&#8217;t like working with the contractor who was messy and somewhat unreliable.  The client especially didn&#8217;t like all the &#8220;nickel and dime&#8221; change orders and hassles.</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td style="padding-top: 10px">So while I feel somewhat redeemed, I&#8217;ve been thinking both about what the client should have done differently and what I could have done differently.</td>
</tr>
<tr>
<td style="padding-top: 10px">The main lessons learned for the client are to:</p>
<ol>
<li>Always make sure you&#8217;re comparing apples to apples when comparing 2 price quotes.  In this case, it would have been relatively easy since my price and design were quite detailed and the client could have spoken with the other contractor and confirmed that all the specifics were in his quote.</li>
<li>Always make sure that price quotes include a detailed scope of work.  This will help limit change orders and price increases.</li>
<li>Always get references and use a <a href="http://www.braitmandesign.com/blog/?p=828" target="_blank">guide like the one here</a></li>
</ol>
</td>
</tr>
<tr>
<td style="padding-top: 10px">I&#8217;m having a bit more problem with the lessons learned for me and would welcome suggestions about how I could have helped the client understand that the lower bid wasn&#8217;t realistic.</td>
</tr>
</tbody>
</table>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Basement Remodeling &#8211; Cost Components</title>
		<link>http://www.braitmandesign.com/home-remodeling/basement-remodeling-cost-components/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/basement-remodeling-cost-components/#comments</comments>
		<pubDate>Mon, 18 May 2009 20:29:36 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>
		<category><![CDATA[Basement Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1192</guid>
		<description><![CDATA[I'm in the process of designing a basement for one of my clients in Bethesda, MD. Since most of us have a hard time believing how expensive remodeling can be, I thought it would be useful to see the costs of the different components for this remodeling project and where cost savings can be achieved.]]></description>
			<content:encoded><![CDATA[<div>
<table id="table1" style="border-style: solid; border-width: 0" border="0" cellspacing="4" cellpadding="4">
<tbody>
<tr>
<td>
<p><div id="attachment_1165" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1165" href="http://www.braitmandesign.com/home-remodeling/basement-remodeling-cost-components/attachment/bathcosts1/"><img class="size-full wp-image-1165" title="bathcosts1" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/bathcosts1.jpg" alt="Proposed Basement Remodel" width="525" height="390" /></a><p class="wp-caption-text">Proposed Basement Remodel</p></div></td>
</tr>
<tr>
<td>I&#8217;m in the process of designing a basement for one of my clients in Bethesda, MD. It&#8217;s a modest split-level 1950&#8217;s era home. The basement is already finished with a vinyl tile floor and drywall walls and ceiling. It&#8217;s split into 2 rooms. They want it converted to a playroom and an au pair&#8217;s bedroom &amp; bath. They were hoping to keep the costs to $40,000 but also wanted some more expensive options such as porcelain tile flooring throughout, a glass shower surround, and recessed lighting fixtures in all rooms.</td>
</tr>
<tr>
<td style="padding-top: 10px">Above is a floor plan for remodeling the basement. You can see that we&#8217;ve kept the wall dividing the space and allocated the space for the bedroom and playroom. The sewer line runs under the floor just a few feet off the new wall that will have toilet and shower stall. Which makes the bath location the most cost effective. I have not included in the drawing the location of light fixtures and other details.</td>
</tr>
<tr>
<td style="padding-top: 10px">Since most of us have a hard time believing how expensive remodeling can be, I thought it would be useful to see the costs of the different components for this remodeling project and where cost savings can be achieved.</td>
</tr>
<tr>
<td style="padding-top: 10px">
<p><div id="attachment_1193" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1193" href="http://www.braitmandesign.com/home-remodeling/basement-remodeling-cost-components/attachment/basementcost02/"><img class="size-full wp-image-1193" title="basementcost02" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/basementcost02.jpg" alt="Budget with Potential Savings" width="525" height="511" /></a><p class="wp-caption-text">Budget with Potential Savings</p></div></td>
</tr>
<tr>
<td style="padding-top: 10px">You can see that even this modest proposal comes to about $62,000. With changes in finish level, we can reduce the cost to just over $50,000. This includes a 10% contingency which is a bare minimum.</td>
</tr>
<tr>
<td style="padding-top: 10px">So here&#8217;s what to keep in mind if you want to achieve savings:</td>
</tr>
<tr>
<td style="padding-top: 10px">
<ol>
<li>The labor costs for specialty trades such as plumbers and electricians is 2-3 times the cost of construction labor. You can lower these costs by keeping down the number of fixtures and difficulty of installation. For this basement, we could lower the costs for the electrician by using fewer surface mount fixtures instead of recessed fixtures like the client originally wanted. Because we have to break into the concrete slab to install the toilet, there&#8217;s not much we can do to reduce the plumbing cost.</li>
<li>We can reduce the cost of the bath by replacing the shower with a bath tub and shower curtain; replacing the vanity with a countertop and drop-in sink, and replacing the ceramic tile with an acrylic insert for the tub walls and vinyl flooring. With the exception of the tub, the other changes are not acceptable to this client.</li>
<li>The largest potential savings can come from the choice of flooring material. In this case, it&#8217;s not the cost of the material but the labor to install the material that makes the biggest difference. Porcelain, stone or ceramic tile takes a lot of labor to install. If we move to a &#8220;sheet&#8221; good such as vinyl or carpet, the labor costs can be reduced substantially.</li>
<li>The basement is cold. It sits directly on a concrete slab and the heating ducts are in soffits on the ceiling. We proposed 2 changes to address the problem: First we suggested furring up the floor an inch and putting insulating foam board between new plywood and the existing floor. I know from personal experience that this makes a tremendous difference. Second, we proposed adding additonal ductwork and moving the registers to just above floor level. A cheaper alternative is to add baseboard heat.</li>
</ol>
</td>
</tr>
<tr>
<td style="padding-top: 10px">These are the costs in the Washington DC area for a fairly bare-bones basement remodel. If you are looking to use more luxurious materials like granite countertops or add additional features such as a kitchenette, the finish costs can easily double or triple.</td>
</tr>
<tr>
<td style="padding-top: 10px"></td>
</tr>
</tbody>
</table>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/basement-remodeling-cost-components/feed/</wfw:commentRss>
		<slash:comments>4</slash:comments>
		</item>
		<item>
		<title>8 Way to Keep Kitchen Remodeling Costs Down</title>
		<link>http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/</link>
		<comments>http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/#comments</comments>
		<pubDate>Thu, 14 May 2009 19:46:17 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Creating Space]]></category>
		<category><![CDATA[Kitchen Remodeling]]></category>
		<category><![CDATA[Kitchens & Baths]]></category>
		<category><![CDATA[Living within the Existing Footprint]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>
		<category><![CDATA[Solutions]]></category>
		<category><![CDATA[Cabinets]]></category>
		<category><![CDATA[cost of remodeling]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1148</guid>
		<description><![CDATA[Thoughts about ways to keep kitchen remodeling costs down.]]></description>
			<content:encoded><![CDATA[<div id="attachment_1153" class="wp-caption alignnone" style="width: 410px"><a rel="attachment wp-att-1153" href="http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/attachment/41stkitchen-2/"><img class="size-full wp-image-1153" title="41stkitchen" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/41stkitchen.jpg" alt="Laminate Countertops" width="400" height="501" /></a><p class="wp-caption-text">Laminate Countertops</p></div>
<p>One of the readers of my newsletter asked me to pull together some thoughts about ways to keep kitchen remodeling costs down &#8212; So here they are:</p>
<ol>
<li>New Cabinets are one of the highest costs in kitchen remodeling.  So the first thing I do with clients is to assess the existing cabinets.  If the boxes are solid and in good shape – I think first about replacing the doors and drawer fronts instead of replacing the whole cabinet.  If it’s primarily the color that you don’t like – think about staining the doors, drawer fronts and frames instead of replacing the cabinets.  That&#8217;s what we did in the kitchen, above.</li>
<li>I hate using cabinet bases that have doors instead of drawers &#8211; but if you&#8217;re keeping the old cabinets and staining them, you can use after-market organizers if you want greater access to old door front base cabinets.</li>
<li>Mix &amp; Match.  If you can keep some but not all of the cabinets or need additional cabinets &#8211; for all but the most modern of design themes, you can very successfully mix and match different designs and woods.  In fact, an un-fitted kitchen can make today&#8217;s kitchen feel more like the center of the home that we all crave.</li>
<li>Another major expense is construction labor.  You can keep those costs lower by eliminating complexity &#8211; create rhythm and interest by use of materials instead of using lots of levels or soffits.</li>
<li>Keep plumbing costs lower by leaving the sink where it is (or close to where it is) and any gas appliances close to their current locations.</li>
<li>Appliances &amp; Plumbing Extras are a 3rd major expense item.<br />
-    Use a 30&#8243;-36” Range instead of separate cooktop and ovens<br />
-    Plan for Single Sink &#8212; unless you usually have more than one cook in the kitchen<br />
-    Forego the Pot Filler &#8212; you&#8217;re going to have to carry the heavy pot full of hot water when you need to drain the pasta anyway<br />
-    Design for a stand-alone Refrigerator – make it look built-in instead of going for the built-in model</li>
<li>Use Laminates!  I know that granite is all the rage – but laminates have come a long way since the 1950’s!  Laminates are used extensively in European-style modern cabinetry and countertops.  Using laminates can save thousands of dollars.  If you can&#8217;t live without an undermount sink, use stone just around the sink area.  Use a large stone trivet near the range.</li>
<li>Lighting  &#8211; Fluorescents have also come a long way in terms of color and function.  We can now design in quite attractive and functional fluorescent fixtures at a fraction of the cost of large areas of recessed can lights.  Similarly, fluorescent under-cabinet lights keep cabinets cooler and save money over halogen or xenon lights.  Save money by finding unusual, but lower cost, pendants for a design accent.</li>
</ol>
<p>Use the money you save to open the kitchen to the rest of the house and to the outdoors.  Create eating and sitting areas on either side of the kitchen so family and guests along with the cook visit together in comfort.  The un-fitted, lower cost kitchen remodel can make the kitchen blend seamlessly with the rest of your casual, comfortable home.  And you can relax knowing you haven&#8217;t mortgaged your soul.</p>
<div id="attachment_1149" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1149" href="http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/attachment/kingkitchen02-2/"><img class="size-full wp-image-1149" title="kingkitchen02" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/kingkitchen02.jpg" alt="kingkitchen02" width="525" height="409" /></a><p class="wp-caption-text">Stain Cabinets Instead of Replacing Them</p></div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Price Drivers in Residential Remodeling</title>
		<link>http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/</link>
		<comments>http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/#comments</comments>
		<pubDate>Fri, 08 May 2009 18:18:17 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[Solutions]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1114</guid>
		<description><![CDATA[Remodeling is expensive! There's just no getting around it. There are 3 main factors that drive price: Size, Complexity &#038; Finish Level.  We'll look at each briefly and then also look at ways to minimize the effect of each.]]></description>
			<content:encoded><![CDATA[<div class="post even">
<table id="table1" style="border-style: solid; border-width: 0" border="0" cellspacing="4" cellpadding="4">
<tbody>
<tr>
<td>
<p><div id="attachment_1127" class="wp-caption alignnone" style="width: 330px"><a rel="attachment wp-att-1127" href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/attachment/pricedrivers1/"><img class="size-full wp-image-1127" title="pricedrivers1" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/pricedrivers1.jpg" alt="Size, Complexity &amp; Finish Level Determine the Cost of Remodeling" width="320" height="314" /></a><p class="wp-caption-text">Size, Complexity &amp; Finish Level Determine the Cost of Remodeling</p></div></td>
</tr>
<tr>
<td>Remodeling is expensive!  There&#8217;s just no getting around it.  There are 3 main factors that drive price: Size, Complexity &amp; Finish Level.  We&#8217;ll look at each briefly and then also look at ways to minimize the effect of each.</td>
</tr>
<tr>
<td style="padding-top: 10px">
<table id="table2" style="border-width: 0" border="0" cellspacing="5" cellpadding="5" width="100%">
<tbody>
<tr>
<td style="vertical-align: top" width="83" align="left"><span style="text-decoration: underline;"><strong>Size</strong></span></td>
<td>The cost to build an addition in the greater Washington, DC area (where I work) starts at about $200 per square foot and goes up to $350 per square or more.  The cost to remodel an existing space starts at about $100 per square foot and goes up to $200 per square or more.  So to build a 20 ft x 20 ft addition, it will cost $80,000 to $140,000.  If the addition includes a kitchen or bath (or both), it will be on the high side of that number and could be even higher depending upon the other 2 factors.  If you&#8217;re remodeling a first floor that&#8217;s 1200 Square Feet, you&#8217;re looking at $120,000 to $240,000.  Obviously, these are large ranges.  It&#8217;s the other 2 factors &#8212; complexity and finish level that determine where you&#8217;ll fit within that range.</td>
</tr>
<tr>
<td style="vertical-align: top" width="83" align="left"><span style="text-decoration: underline;"><strong>Complexity</strong></span></td>
<td>Complexity covers a lot of ground.  Kitchens and baths are complex because of the number of cabinets, plumbing fixtures and connections, appliances, surfaces (tile, granite, glass) and so on.  They will always be on the high side of the range.  For example, a basic bath remodel is a bare minimum of $15,000.  Most bath remodels are closer to $25,000 to $30,000.  High-end baths can be $50,000 to $75,000 or more.  A basic kitchen upgrade starts at about $25,000 and a remodel starts at about $40,000.  There&#8217;s no upper limit for kitchens.</p>
<p>A rectangular building is easier to build that one with angles and curves &#8212; curves are particularly difficult whether you&#8217;re talking about a wall, a deck, or a cabinet.  That&#8217;s because most building materials are straight.  Obviously, it&#8217;s easier to build a curved stone wall than a concrete, metal or wood wall.  Years ago when I was helping a cabinetmaker figure out his pricing, we determined that he needed to double his prices for curve-fronted cabinets.  Installing cabinets and plumbing is more complex &#8212; takes more steps &#8212; than just putting up drywall.  So kitchens and baths are usually the most expensive rooms in the house.  It&#8217;s less complex to tap into an existing waste line than running a new waste line, so it&#8217;s cheaper to install a new powder room directly below an existing bath than on the other side of the house.  It&#8217;s a long list, but you get the idea.</td>
</tr>
<tr>
<td style="vertical-align: top" width="83" align="left"><span style="text-decoration: underline;"><strong>Finish Level</strong></span></td>
<td>Finish level reflects the cost of the materials and the complexity of installation.  Understanding the effect of higher cost materials is straightforward &#8212; granite versus laminate countertops; stain-grade vs. paint-grade windows; hand-crafted vs. stock tile; stone vs. porcelain tile; high-end appliances versus mid-level appliances. and so on.  Complexity of installation refers to design decisions to use 3-part crown molding versus 1-part crown.  The 3 parts represent more material (and more cost) but the real cost usually comes in labor because 3-part molding takes 3-4 times more time to install &#8212; and time is definitely money in the remodeling business.  Plus finish labor is the among the most expensive labor in remodeling &#8212; finish carpenters are paid more than other carpenters and cabinetmakers are paid more than finish carpenters.  Other examples of more complex (and therefore more costly) finish choices include items such as fancy tile patterns,  multiple shower-heads, 2-sink kitchens, home entertainment systems.  These are all features that add material cost and labor cost to a remodeling project.</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td style="padding-top: 10px">But you don&#8217;t need to sacrifice your life style or a sense of luxury and quality in order to keep costs down.</td>
</tr>
<tr>
<td style="padding-top: 10px">First, square footage is overrated!  I can almost always achieve a client&#8217;s design goals within the existing footprint or with strategic bump-outs.  Second, it&#8217;s usually more comfortable and satisfying to re-purpose space rather than simply add a big addition on the back.  Think of your neighbors who have added large additions only to leave the older portions of the home empty most of the time.  Instead, you can re-purpose old spaces &#8212; maybe move the kitchen to where the dining room used to be.  And then the lot can be used to create wonderful outdoor/indoor spaces with a great sense of privacy and serenity.</td>
</tr>
<tr>
<td style="padding-top: 10px">Second, materials can be used in ways that create luxury without great cost.  In the bath, below, while the finishes look rich, the total cost of the finishes were well below 50% of the total cost (usually finishes are 60-70% of the cost of the remodel)  See Article on<a href="http://www.braitmandesign.com/blog/?p=917" target="_blank"> Controlling Costs.</a> We used the same travertine tile for all surfaces &#8212; this allowed me to get true wholesale/pallet pricing.  There are no fancy patterns or mosaic borders &#8212; keeping the cost of tile laying down.  The room is a simple rectangle &#8212; the only complexity is added by the angle of  the vanity (not shown).  The fixtures are mid-level &#8212; but well designed.  The shower has a single showerhead &#8212; a multi-function hand-held on a bar that allows it to be used in multiple ways.  We used a solid-surface shower pan rather than tile for the shower floor.  We kept and re-used<br />
existing doors and door hardware.</td>
</tr>
<tr>
<td style="padding-top: 10px">
<p><div id="attachment_1116" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1116" href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/attachment/king_mastershower/"><img class="size-full wp-image-1116" title="king_mastershower" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/king_mastershower.jpg" alt="Luxury Materials Used Cost-Effectively" width="525" height="350" /></a><p class="wp-caption-text">Luxury Materials Used Cost-Effectively</p></div></td>
</tr>
<tr>
<td style="padding-top: 10px">Imagine how much more labor-intensive it was to lay the tile in the small powder room below with all the different tiles and patterns.  While equally stunning in an understated way, the bath above, was much less labor intensive than the one below.</td>
</tr>
<tr>
<td style="padding-top: 10px">
<p><div id="attachment_1117" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1117" href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/attachment/willow_powderroom/"><img class="size-full wp-image-1117" title="willow_powderroom" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/willow_powderroom.jpg" alt="Complex Tile Patterns Add Expensive Labor" width="525" height="407" /></a><p class="wp-caption-text">Complex Tile Patterns Add Expensive Labor</p></div></td>
</tr>
<tr>
<td style="padding-top: 10px">Third, interesting and complex details can be created in less labor-intensive ways.  The wainscoting in the breakfast nook, below, uses the wall as the &#8220;recessed panel&#8221;.  We used prime 1x stock for the stiles and rails.  The ledge is simple crown with sill material on top.  This design simplified the labor and made the wainscoting detail affordable here and in the dining room.  Additional complexity was added in the home, below through the use of paint to emphasize the architecture (<a href="http://www.braitmandesign.com/blog/?p=429" target="_blank">see related article</a>).  Paint is one of the least expensive ways to add detail and complexity to a remodel.</td>
</tr>
<tr>
<td style="padding-top: 10px">
<p><div id="attachment_1118" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1118" href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/attachment/basta_breakfast-2/"><img class="size-full wp-image-1118" title="basta_breakfast" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/basta_breakfast.jpg" alt="Effective By Relatively Simple Wainscoting" width="525" height="353" /></a><p class="wp-caption-text">Effective By Relatively Simple Wainscoting</p></div></td>
</tr>
<tr>
<td style="padding-top: 10px">So, when you&#8217;re planning a remodel, keep in mind ways to keep down costs while still adding luxury and cost-effective details.</td>
</tr>
<tr>
<td style="padding-top: 10px">All images courtesy of <a href="http://www.braitmandesign.com/" target="_blank">Braitman Design/Build</a></td>
</tr>
</tbody>
</table>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/feed/</wfw:commentRss>
		<slash:comments>4</slash:comments>
		</item>
	</channel>
</rss>
