<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>At the Intersection of Art, Architecture &#38; Design&#187; Contractors &amp; Contracting &#8211; At the Intersection of Art, Architecture &amp; Design</title>
	<atom:link href="http://www.braitmandesign.com/category/contractors-contracting/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.braitmandesign.com</link>
	<description>Helping Homeowners turn their Existing Home into the Home of Their Dreams</description>
	<lastBuildDate>Fri, 30 Jul 2010 09:36:48 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>How to Avoid Breaking the Remodeling Budget</title>
		<link>http://www.braitmandesign.com/home-remodeling/avoid-remodeling-budget-pitfalls/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/avoid-remodeling-budget-pitfalls/#comments</comments>
		<pubDate>Mon, 01 Feb 2010 14:51:20 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>
		<category><![CDATA[The Remodeling Process]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/?p=1805</guid>
		<description><![CDATA[How to avoid financial pitfalls in home remodeling - part 1]]></description>
			<content:encoded><![CDATA[<p>In my experience, homeowners experience 4 different types of bad experiences during and after a major remodel project:</p>
<ol>
<li>Financial &#8211; The actual costs are much greater than the anticipated costs</li>
<li>Financial &#8211; They invest more money than they can get out during resale</li>
<li>Problems with Contractors</li>
<li> Style/Look – When it’s completed, there are certain areas or items that they’re not satisfied with.</li>
<li> Function &#8211; Don’t like way certain areas or items function</li>
</ol>
<div id="attachment_1809" class="wp-caption alignnone" style="width: 516px"><img class="size-full wp-image-1809" title="Successful Home Remodeling" src="http://www.braitmandesign.com/wp-content/uploads/2010/02/43rdSunRoom_LG.jpg" alt="Successful Home Remodeling" width="506" height="648" /><p class="wp-caption-text">Successful Home Remodeling</p></div>
<p>And many of these areas overlap – For example, a contractor makes a decision on his own without asking about placement of an appliance or cabinet and the homeowner doesn’t like the result.</p>
<p>In this series of articles (on successive Mondays), we’ll address each of these area starting today with Financial Pitfalls – Costs Exceed Budget</p>
<p><span style="text-decoration: underline;"><strong>Pitfall:  Actual Costs are Greater Than Anticipated: </strong></span></p>
<p><span style="text-decoration: underline;"><strong>Planning:</strong></span> The planning for a remodeling project must be extraordinarily comprehensive because even small details can have big price tags.  I got a question recently from a homeowner living in Pennsylvania saying that she wanted to do an attic remodel and got a ballpark from a contractor of $200/sf for the remodel  She wanted to know if that was reasonable.  It certainly is a starting point.  In the area I work – the greater Washington DC area – the price for an attic remodel could range from $100/sf to $250/sf.  For a 1000 sf attic, that’s a price range of $100,000 to $250,000.  Not a good basis for any planning except whether it’s even worth planning further.  Similarly, even for the exact same floor plan, I can’t give much closer a price range without having worked through the details.  Let me give just a few examples: a kitchen with laminate counters can cost $5,000 less than a kitchen with the same square feet of granite counters.  I can spend anywhere from $4,000 to $20,000 for appliances for the same size kitchen.  I can spend $1,000 to $6,000 on flooring.  And lighting can be anywhere from $1,000 to $15,000 for the same area.  A single sink can be anywhere from $100 t0 $1,200.  And the list goes on.  When I work with a client, I start with the ballpark only so they can figure out whether to continue.  Then I work on a floor plan with the functionality that they need.  And then we start working on the details WITH THEIR BUDGET IN MIND.</p>
<p><span style="text-decoration: underline;"><strong>Compromise: </strong></span>With the basic goal in hand in the form of a floorplan and wishlist of specifications, we can then start to plan the specifics.  For most homeowners this means identifying specific compromises to get close to their goals within their budget.  I usually present a detailed budget that meets their budget and one that contains their full set of desires.  Sometimes these can be tens of thousands of dollars apart.  Then we start compromising.  Maybe some items are so important that it’s worth increasing their budget.  Some high priced items are jettisoned (maybe that higher priced stove or dishwasher or specialty cabinets) for lower priced items in order to stay in the budget.  Or maybe the project is phased so that they get it all – just not all at once.</p>
<p><span style="text-decoration: underline;"><strong>Execution: </strong></span>The other reason for detailed planning is that a change at the planning stage is incredibly cheaper than a change-order after the job starts.  I always include 10%-25% contingency in the budget to take account of inevitable unexpected items when the walls are opened up and the equally inevitable “while you’re here” requests.  That’s why my projects almost never exceed the budget.  But when you don’t do detailed planning up-front, the costs can exceed the budget by 50% or even 100% because it’s costly to change plans in the middle of the project.  The costs of change come from</p>
<p><span style="text-decoration: underline;"><strong>For further reading:</strong></span></p>
<p>-    <a href="http://www.braitmandesign.com/home-remodeling/budgeting-for-a-remodeling-project/" target="_self"> Budgeting for a Remodeling Project</a><br />
-    <a href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cut-20000-dollars-out-of-85000-dollar-kitchen-remodel/">How to cut $20,000 Out of A $85,000 Kitchen Remodel</a><br />
-    <a href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/">What Does it Cost to Remodel a kitchen?</a><br />
-    <a href="http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/">8 Way to Keep Kitchen Remodeling Costs Down</a><br />
-    <a href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/">Price Drivers in Residential Remodeling</a><br />
-    <a href="http://www.braitmandesign.com/home-remodeling/budgeting-for-a-remodeling-project/">Budgeting for a Remodeling Project</a><br />
-    <a href="http://www.braitmandesign.com/home-remodeling/basement-remodeling-cost-components/">Basement Remodeling – Cost Components</a><br />
-    <a href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/low-cost-kitchen-remodel/">A Low-Cost Kitchen Remodel</a><br />
-    <a href="http://www.braitmandesign.com/home-remodeling/you-control-remodeling-costs-%E2%80%93-whether-you-know-it-or-not/">You control remodeling costs</a><br />
-    <a href="http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/">Comparing Price Estimates – Make Sure It’s Apples to Apples</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/avoid-remodeling-budget-pitfalls/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Comparing Contractor Estimates &#8211; Part 1</title>
		<link>http://www.braitmandesign.com/home-remodeling/comparing-contractor-estimates/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/comparing-contractor-estimates/#comments</comments>
		<pubDate>Mon, 07 Dec 2009 23:27:21 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Working with Contractors]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1618</guid>
		<description><![CDATA[It's frustrating -- to say the least--  when you receive wildly different price quotes for what you think is the same work. This article is about how to compare estimates when you’ve provided the contractor a drawing of what you want. ]]></description>
			<content:encoded><![CDATA[<div id="attachment_1619" class="wp-caption alignnone" style="width: 394px"><a href="http://www.braitmandesign.com/blog/wp-content/uploads/2009/12/StoneTerrace03.jpg"><img class="size-full wp-image-1619" title="StoneTerrace03" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/12/StoneTerrace03.jpg" alt="Comparing Prices on a Stone Terrace" width="384" height="255" /></a><p class="wp-caption-text">Comparing Prices on a Stone Terrace</p></div>
<p>One of the most frustrating experiences for a homeowner looking to do work on their home is to get estimates that differ wildly in price – especially when all the contractors are recommended by friends or neighbors.  This article is about how to compare the estimates when you’ve provided the contractor a drawing of what you want.  In a future article, we’ll talk about the more complicated situation where you haven’t provided a drawing.</p>
<p>In my experience, the primary reason that contractor estimates differ by a third, 50% or even 100% is that the scope quoted is dramatically different.  Contractors, small contractors in particular, will often provide a sentence or bullet points about what’s included.  But often fail to spell out clearly how they’ll do the job, what is being done by others, and what allowances or assumptions they’ve made.</p>
<p>I recently designed a basement media room including a wet bar.  The total price I quoted after the design was approved was $45,000.  The price was based on estimates from subcontractors on individual components including demolition, construction, plumbing, electrical, tiling, painting, installation of the new media equipment, plus my time for construction management and a 10% contingency.  The contingency, of course, would only be used if necessary.</p>
<p>Having been a client of home improvement contractors long before I ever became a contractor, my philosophy is a bit different from most contractors.  As the client I did not want cost surprises at the end of the job.  If I was told the job was going to cost $30,000, I didn’t want to end up paying $35,000 let alone $45,000.  So when I do job costing, I use assumptions – often called allowances – based on the client’s actual tastes and not assuming “builder” grade materials.  I also always include at least 10% contingency and often 15% to 20% contingency depending on the job and the age and general condition of the house.</p>
<p>My business model is different in another way from most design/build firms in that I separate the design and build phases.  Clients are free to take my design to others for bid.  That’s what this client did; he took the design to a carpenter he’s used in the past and got a quote of $20,000.  He asked me to talk with this other contractor to see if the lower bid made sense to take.</p>
<p>While at first blush it seemed like the homeowner could save a lot of money by using the other contractor, it turns out that the carpenter was really bidding only on the part of the job that he was comfortable doing – the demolition, construction, and tiling.  The bid did not include plumbing, electrical, electronics, painting, or construction management.  In addition, the carpenter assumed that the homeowner would purchase all the decorative items like tile, carpet, plumbing fixtures, drawer pulls, and so on.  And, of course, there was no provision for contingency.  When we added back in the other trades, the cost of materials, and the contingency, the difference in the bids was about $3,500.</p>
<p>When I asked the homeowner whether he was interested in performing the construction management role – sourcing and ordering materials, hiring and scheduling subcontractors, he indicated that he did not have time and wanted me to play that role.  When we added back in this time, the actual “bid” was just slightly higher than my original bid.  But the homeowner still wanted to use contractors that he had used before so I kept the build contract but subcontracted to the carpenter with whom the homeowner was already familiar.</p>
<p>When you have a good vision of what you want – and you share that vision clearly with a drawing – to contractors, the difference in price has to come down to 3 things:<br />
<span style="text-decoration: underline;"><strong><br />
1.    Scope:</strong></span> A likely source of price differences comes from differences in scope.</p>
<p><span style="text-decoration: underline;">Proportion of the full Job:</span> When you get a quote that excludes portions of the full scope, you can’t evaluate that estimate until you also get estimates for all the work excluded.  Plus you need to think about whether you want to be in the position of construction management where you need to hire multiple trades and determine the appropriate sequence of work.</p>
<p><span style="text-decoration: underline;">Construction Approach:</span> Sometimes contractors will go about building the same thing differently.  I built a “stone” patio for a client where I used an underlayment to separate the movement of the deck from the stone tile.  I also “overbuilt” the deck to limit the amount of movement.  Another contractor could have produced the same look with less caution about making sure the stone tile didn’t crack.   My approach took more time and materials and therefore more money than another contractor might have charged.</p>
<p>You may need to ask sufficient questions about the construction process to identify that the approach is different and why each contractor is taking the approach they’re taking.  Ultimately, you’ll need to exercise judgment about whether the extra precautions taken by one contractor are “worth” the additional price.  Often the differences in construction approach are only noticeable in months or years as the work “wears” differently.</p>
<p><span style="text-decoration: underline;"><strong>2.    Materials:</strong></span> Another source of price difference comes from either actual differences in material costs or assumed differences in material costs.</p>
<p>Allowances &amp; Mark-ups:  Sometimes a contractor will include “builder grade” allowances for fixtures and materials in order to keep the estimate appearing low – even if they know that the client is likely to want to purchase more costly materials.  Material costs can add up to over 50% of the cost of the job.  So look closely at the contractors assumptions or allowances about material costs and how much the contractor “marks up” material costs.</p>
<p>Material Quality:  Most of us know that cedar decking costs more than pressure treated decking.  But there are lots of other less obvious material choices that can affect total price, maintenance, and longevity.  Staying with deck building, the price of galvanized hardware is considerably less than stainless steel hardware.  The price of azek bandboard is more expensive than pressure treated but requires less maintenance over time.</p>
<p><span style="text-decoration: underline;"><strong>3.    Labor Rates &amp; Business Model:</strong></span> If scope and materials are the same, the only other variable is labor.  Labor costs can differ either because one company charges more (or less) for the same work or because a company is also charging for additional supervisory or overhead time.  In my experience, there are 3 tiers in the remodeling business.  At the top are mid-sized construction or design/build companies.  Overall, their labor is often more expensive because the wage rate they charge for construction workers must also cover overhead and supervisory time.  On the other hand, they are often more able to respond quickly and can provide full-service including sourcing of materials and design assistance.  At the next tier are very small companies where management and labor is the same person – it’s one or two guys who quote the work, plan what to do, and perform the work.  These are US-born men or women who work for themselves and who are putting kids through college and saving toward retirement.  Their wage rate reflects a middle-class vision of themselves.    The next level are also very small firms but they are often foreign-born workers whose wage level keeps a roof over head and food on the table but who might not be saving for college or paying a mortgage.  All 3 models can produce identical work for differing costs.  However, the homeowner is sometimes required to know more and to take on more of the sourcing and management when using the the 2nd and 3rd business models described here.</p>
<p>I strongly advise homeowners when faced with widely divergent price bids to take the time to figure out what’s driving the difference.  If the difference is in scope or materials, you will either end up with something different than you expected or will end up paying more than the low quote implies.  Either result will be very frustrating.  If the difference is in labor rates and business model, then you need to consider what’s being expected of you in terms of sourcing or construction management and whether you’re prepared to undertake these additional burdens.</p>
<p>It’s absolutely true that you can find terrific workers who charge a fraction of what larger companies charge for the same work.  I routinely use a mason who does work for about 1/3 less than larger masonry companies.  In exchange for the less expensive – but exquisite – results, I have to secure the permits myself, to keep a flexible schedule since the owner is not good at communicating work schedule, and I often have to use hand-signals or find a friend who speaks Spanish to communicate nuances of what’s wanted.  The product though is as good as I’ve seen in this area.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/comparing-contractor-estimates/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>What Does it Cost to Remodel a kitchen?</title>
		<link>http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/</link>
		<comments>http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/#comments</comments>
		<pubDate>Thu, 15 Oct 2009 21:27:12 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Kitchen Remodeling]]></category>
		<category><![CDATA[Kitchens & Baths]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[Cabinets]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Modernizing Older Homes]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1387</guid>
		<description><![CDATA[What does it cost to renovate a kitchen?  I’ve had 3-4 contacts within the past few weeks from homeowners who wish to renovate their kitchens for budgets ranging from $15,000 to $25,000.  In their words, they want to gut their kitchens and replace everything from cabinets to lighting to flooring.]]></description>
			<content:encoded><![CDATA[<div id="attachment_1390" class="wp-caption alignnone" style="width: 510px"><a rel="attachment wp-att-1390" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/parkcrest_kitchen525-2/"><img class="size-full wp-image-1390" title="ParkCrest_Kitchen525" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/ParkCrest_Kitchen525.jpg" alt="Kitchen #1" width="500" height="332" /></a><p class="wp-caption-text">Kitchen #1</p></div>
<p>What does it cost to renovate a kitchen?  I’ve had 3-4 contacts within the past few weeks from homeowners who wish to renovate their kitchens for budgets ranging from $15,000 to $25,000.  In their words, they want to gut their kitchens and replace everything from cabinets to lighting to flooring.</p>
<p>My short answer to each of them was that I can’t do it for that money – and believe that it’s only possible if they’re willing to take on some of the tasks themselves – including my roles of design and construction management.</p>
<p>But it got me thinking about what drives the cost of kitchen remodeling.  Here are the actual costs for 4 very different kitchens that we’ve done recently:</p>
<div id="attachment_1391" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1391" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/4kitchens/"><img class="size-full wp-image-1391" title="4Kitchens" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/4Kitchens.jpg" alt="Cost Comparisons for 4 Kitchens" width="525" height="296" /></a><p class="wp-caption-text">Cost Comparisons for 4 Kitchens</p></div>
<p>The first 3 are nice but modest kitchens.  While the 4<sup>th</sup> is clearly high-end – but is still more modest than what is usually depicted in the glossy magazines.  Homeowner 1 &amp; 2 also reduced costs by doing some of the work themselves as I describe below.  All four kitchens are in the greater Washington DC area and all were remodeled during the 2007-2009 time period.  Three were in the close-in Maryland suburbs of Silver Spring, Takoma Park, and Bethesda.  One was in Upper Northwest Washington.  The prices &#8212; especially construction labor &#8212; will vary by region of the country.</p>
<div id="attachment_1392" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1392" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/willowkitchen_frmfamily-2/"><img class="size-full wp-image-1392" title="WillowKitchen_frmFamily" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/WillowKitchen_frmFamily.jpg" alt="Kitchen #2" width="525" height="309" /></a><p class="wp-caption-text">Kitchen #2</p></div>
<p>Construction labor drives kitchen remodeling costs.  It takes skilled labor to handle the very diverse tasks that are required to fix and modify wiring, plumbing, flooring, and to hang cabinets so that they are level and secure.  Construction labor accounted for 40% to 50% of the total costs of the remodel.  The labor required to design, source materials, and manage construction accounted for another 15% to 20% of the total cost.  If the homeowner can take over some of these high-cost items, overall remodeling costs can be greatly reduced!  In my experience, the tasks that homeowners are most likely to be comfortable performing including design, selecting and purchasing materials, project management, painting and tiling.  A homeowner willing to take on one or more of these tasks might be able to remodel a kitchen for $25,000 – if they are also willing to make some accommodations regarding material choices AND the keep the kitchen configuration pretty much unchanged!</p>
<p>The homeowner for kitchen 1 did the painting themselves; the homeowners for kitchen 2 tiled the floor themselves plus (an artist) created the glass art windows &amp; backsplash.  Both homeowners did some of the material sourcing themselves.</p>
<p>Changes that drive up both material and construction costs include opening up the kitchen to the rest of the house and to the outdoors – something that literally every single one of my clients desires.</p>
<p>The reason that construction costs seem to remain about 40-50% of total costs is that as more materials are added – such as windows and skylights or more complex plumbing and lighting – the cost of construction increases in order to properly install these additional features.</p>
<div id="attachment_1396" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1396" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/basta_kitchenmain-3/"><img class="size-full wp-image-1396" title="Basta_KitchenMain" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/Basta_KitchenMain.jpg" alt="Kitchen #3" width="525" height="359" /></a><p class="wp-caption-text">Kitchen #3</p></div>
<p>So now let’s look at how to control the 40% to 50% of costs that are paid for materials.</p>
<p><strong><span style="text-decoration: underline;">Cabinetry Drives Costs</span></strong>:  In all 4 kitchens, cabinetry was the highest price item accounting for 15% to 17% of the total budget.  And, in my opinion, it’s one area where you should pay for quality and function.  If we look at the first kitchen, we could have lowered the cabinetry costs by perhaps $2,000 by purchasing cabinets made with particle board frames and with doors instead of drawers in base cabinets.  But penny-pinching in this area can lead to cabinets that fall apart quickly and back strain and inconvenience.  All but the 4<sup>th</sup> kitchen used stock cabinetry and even the 4<sup>th</sup> kitchen only used certain specialty cabinetry.  None used cabinet fronts for appliances.  Custom cabinetry and finishes would have driven the costs of cabinets for the high-end kitchen up as much as $10-$20,000 (or more).</p>
<p>Kitchens 1 &amp; 2 kept cabinets costs low simply by limiting the amount of cabinets.  Both kitchens used closet pantries to eliminate several thousand in cabinet costs.  Building walls is much cheaper than buying cabinets.  A pantry can use ventilated or solid shelving at a fraction of the cost and with much great convenience than using large pantry cabinets.</p>
<p>IF your cabinets are in good shape, you can save half the cost of new cabinets by re-facing the cabinets instead of replacing them.  An even better way to save money if all you’re trying to do is change the look is to paint or stain the cabinets.  For one client, we spent only $1,000 to sand and re-stain the cabinets a very dark cherry color.  This totally changed the look of the kitchen.</p>
<p><strong><span style="text-decoration: underline;">Appliances &amp; Countertops</span></strong>:  These 2 categories account for 10% to 16% of costs.  Here is definitely an area where one can save without sacrificing function.  Using laminate instead of granite, concrete or solid surface material would have reduced the countertop costs by at least 75% &#8212; $2,000 to $7,000 savings!  And today’s laminates are much improved in performance and looks from the Formica of the 1950’s.</p>
<p>Believe it or not, all of these kitchens could have spent much more on appliances than they did.  Even the high-end kitchen used a standard depth refrigerator instead of a counter-depth built-in refrigerator.  The first 2 kitchens used ranges instead of cooktops with separate built-in ovens.  This is definitely an area where homeowners can save money without sacrificing a lot of function or looks.</p>
<p><strong><span style="text-decoration: underline;">Windows, Doors &amp;  Skylights:</span> </strong>All the Kitchens were opened to the rest of the house.  Kitchens 2, 3, and 4 were all opened up to the outdoors as well.  This added anywhere from $2,000 to $18,000 in material costs alone – and even more in labor.  Again, in my opinion, these costs are well worth the improvements in lifestyle and enjoyment.  Something that may be worth postponing your kitchen remodel until you can afford.</p>
<div id="attachment_1397" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1397" href="http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/attachment/allen_kitchen02-2/"><img class="size-full wp-image-1397" title="Allen_Kitchen02" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/10/Allen_Kitchen02.jpg" alt="Partial View of Kitchen #4" width="525" height="350" /></a><p class="wp-caption-text">Partial View of Kitchen #4</p></div>
<p><strong><span style="text-decoration: underline;">Flooring:</span> </strong> The cost of flooring has a lot to do with the material and the detail. All of these homeowners kept costs relatively low – the 1<sup>st</sup>, 3<sup>rd</sup> and 4<sup>th</sup> all used hardwood and the cost differences have to do with how much of the flooring was new and the size of the space.  The 2<sup>nd</sup> kitchen used tile.  The cost reflects only the cost of the material since the homeowner saved money by doing installation themselves.  They also selected very attractive but low cost porcelain tile.  None of the homeowners used special inlays or patterns that would have jacked up the price.</p>
<p><strong><span style="text-decoration: underline;">Backsplash:</span></strong> Here’s an area where you can make a lot of impact with a low cost.</p>
<p><strong><span style="text-decoration: underline;">All the Rest:</span> </strong>Lighting fixtures and plumbing fixtures were costly in the 4<sup>th</sup> kitchen but quite modest in the other 3.  This area, in my opinion, is kind of like appliances where you can get a lot of function for a relatively inexpensive price.  Bells and Whistles and designer brands add a lot of price with only.</p>
<p><strong><span style="text-decoration: underline;">Summary:</span></strong> If you’re trying to get a sense of how much it will cost to “completely” remodel your kitchen, I would use the following ballpark formulas.  This will give you a reasonable sense of what it will take.  Then you can use the guidance, above, to think through how to keep the remodel costs as low as reasonably achievable.  Remember, these numbers are for the greater Washington DC area.  Prices &#8212; especially construction labor &#8212; will vary in different parts of the country.</p>
<table border="0" cellspacing="0" cellpadding="0">
<tbody>
<tr>
<td width="451" valign="top">If you’re keeping the existing configuration with no   changes to walls or functions.</td>
<td width="108" valign="top">$300 &#8211; $325/sf</td>
</tr>
<tr>
<td width="451" valign="top">If you’re opening up to the rest of the house</td>
<td width="108" valign="top">$325 &#8211; $400/sf</td>
</tr>
<tr>
<td width="451" valign="top">If you’re opening up to the house &amp; to the outside</td>
<td width="108" valign="top">$350 &#8211; $450/sf</td>
</tr>
<tr>
<td width="451" valign="top">If you want a designer kitchen</td>
<td width="108" valign="top">$450 &#8211; $650/sf</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/kitchens-baths/kitchen-remodeling/cost-remodel-kitchen/feed/</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>Comparing Price Estimates &#8211; Make Sure It&#8217;s Apples to Apples</title>
		<link>http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/#comments</comments>
		<pubDate>Mon, 18 May 2009 23:42:27 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[Basement Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>
		<category><![CDATA[The Remodeling Process]]></category>
		<category><![CDATA[Working with Contractors]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1199</guid>
		<description><![CDATA[This blog is half rant and half advice about how to evaluate bids from remodeling contractors.]]></description>
			<content:encoded><![CDATA[<div class="post even">
<table id="table1" style="border-style: solid; border-width: 0" border="0" cellspacing="4" cellpadding="4">
<tbody>
<tr>
<td></td>
</tr>
<tr>
<td>
<div id="attachment_1209" class="wp-caption alignnone" style="width: 507px"><a rel="attachment wp-att-1209" href="http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/attachment/changeorder1/"><img class="size-full wp-image-1209" title="changeorder1" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/changeorder1.jpg" alt="Accurate Contract Scope Keep Change Orders To a Minimum" width="497" height="400" /></a><p class="wp-caption-text">Accurate Contract Scope Keep Change Orders To a Minimum</p></div>
<p>This blog is half rant and half advice about how to evaluate bids from remodeling contractors.</td>
</tr>
<tr>
<td>About 9 months ago I lost a job for a basement remodel on &#8220;price&#8221;.  The winning contractor came in with a fixed price of $33,000 based on a brief discussion with the client.  My firm separates design and construction and the client liked what they heard from us and our references so they went ahead with us to do design (this is after they got the fixed price quote, mentioned above).  After a fairly detailed design, I gave the client an estimated price of $53,000.  Not surprisingly, the client thought the $33,000 was more attractive and went with the other firm.  When I heard that another contractor had bid $33,000, I was quite surprised and suspected that the difference reflected a different scope and not real construction price differences.  I tried to have a conversation with my client about whether the scope was the same but the client saw only the bottom line.</td>
</tr>
<tr>
<td>I thought I had developed a fairly good relationship with the client so decided to check in after the job was scheduled for completion.  I just called.  Here&#8217;s what I learned</td>
</tr>
<tr>
<td style="padding-top: 10px">
<table id="table2" style="border-width: 0pt; text-align: left;" border="0" cellspacing="5" cellpadding="5" width="100%">
<tbody>
<tr>
<td style="vertical-align: top; text-align: center;" width="24">1</td>
<td>The job took 2 months longer than expected.</td>
</tr>
<tr>
<td style="vertical-align: top; text-align: center;" width="24">2</td>
<td>The final job costs were $50,700 &#8212; a whopping 54% over-budget.  Note that we included $5,000 for contingency (not included by the other firm) so the total costs were almost exactly the same.  Plus we have a record of coming in on-budget based on detailed up-front budgeting.</td>
</tr>
<tr>
<td style="vertical-align: top; text-align: center;" width="24">3</td>
<td>Change-orders included the following items:</p>
<table id="table3" border="0" width="100%">
<tbody>
<tr>
<td width="24" align="center">-</td>
<td>The bath location had to be moved to the location we suggested</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>Lighting was upgraded to recessed lighting (included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>The inspector required them to include an egress window (included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>HVAC was upgraded (included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>Finish allowances were exceeded by 500% (upgraded finishes were included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>Additional walls were constructed (included in our initial quote)</td>
</tr>
<tr>
<td width="24" align="center">-</td>
<td>Additional labor for removing and reinstalling bookcases and other case goods (included in our initial quote)</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td style="vertical-align: top; text-align: center;" width="24">4</td>
<td>The client was furious about the job.  They didn&#8217;t like working with the contractor who was messy and somewhat unreliable.  The client especially didn&#8217;t like all the &#8220;nickel and dime&#8221; change orders and hassles.</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td style="padding-top: 10px">So while I feel somewhat redeemed, I&#8217;ve been thinking both about what the client should have done differently and what I could have done differently.</td>
</tr>
<tr>
<td style="padding-top: 10px">The main lessons learned for the client are to:</p>
<ol>
<li>Always make sure you&#8217;re comparing apples to apples when comparing 2 price quotes.  In this case, it would have been relatively easy since my price and design were quite detailed and the client could have spoken with the other contractor and confirmed that all the specifics were in his quote.</li>
<li>Always make sure that price quotes include a detailed scope of work.  This will help limit change orders and price increases.</li>
<li>Always get references and use a <a href="http://www.braitmandesign.com/blog/?p=828" target="_blank">guide like the one here</a></li>
</ol>
</td>
</tr>
<tr>
<td style="padding-top: 10px">I&#8217;m having a bit more problem with the lessons learned for me and would welcome suggestions about how I could have helped the client understand that the lower bid wasn&#8217;t realistic.</td>
</tr>
</tbody>
</table>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/comparing-price-estimates-make-sure-its-apples-to-apples/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>8 Way to Keep Kitchen Remodeling Costs Down</title>
		<link>http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/</link>
		<comments>http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/#comments</comments>
		<pubDate>Thu, 14 May 2009 19:46:17 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Creating Space]]></category>
		<category><![CDATA[Kitchen Remodeling]]></category>
		<category><![CDATA[Kitchens & Baths]]></category>
		<category><![CDATA[Living within the Existing Footprint]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>
		<category><![CDATA[Solutions]]></category>
		<category><![CDATA[Cabinets]]></category>
		<category><![CDATA[cost of remodeling]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1148</guid>
		<description><![CDATA[Thoughts about ways to keep kitchen remodeling costs down.]]></description>
			<content:encoded><![CDATA[<div id="attachment_1153" class="wp-caption alignnone" style="width: 410px"><a rel="attachment wp-att-1153" href="http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/attachment/41stkitchen-2/"><img class="size-full wp-image-1153" title="41stkitchen" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/41stkitchen.jpg" alt="Laminate Countertops" width="400" height="501" /></a><p class="wp-caption-text">Laminate Countertops</p></div>
<p>One of the readers of my newsletter asked me to pull together some thoughts about ways to keep kitchen remodeling costs down &#8212; So here they are:</p>
<ol>
<li>New Cabinets are one of the highest costs in kitchen remodeling.  So the first thing I do with clients is to assess the existing cabinets.  If the boxes are solid and in good shape – I think first about replacing the doors and drawer fronts instead of replacing the whole cabinet.  If it’s primarily the color that you don’t like – think about staining the doors, drawer fronts and frames instead of replacing the cabinets.  That&#8217;s what we did in the kitchen, above.</li>
<li>I hate using cabinet bases that have doors instead of drawers &#8211; but if you&#8217;re keeping the old cabinets and staining them, you can use after-market organizers if you want greater access to old door front base cabinets.</li>
<li>Mix &amp; Match.  If you can keep some but not all of the cabinets or need additional cabinets &#8211; for all but the most modern of design themes, you can very successfully mix and match different designs and woods.  In fact, an un-fitted kitchen can make today&#8217;s kitchen feel more like the center of the home that we all crave.</li>
<li>Another major expense is construction labor.  You can keep those costs lower by eliminating complexity &#8211; create rhythm and interest by use of materials instead of using lots of levels or soffits.</li>
<li>Keep plumbing costs lower by leaving the sink where it is (or close to where it is) and any gas appliances close to their current locations.</li>
<li>Appliances &amp; Plumbing Extras are a 3rd major expense item.<br />
-    Use a 30&#8243;-36” Range instead of separate cooktop and ovens<br />
-    Plan for Single Sink &#8212; unless you usually have more than one cook in the kitchen<br />
-    Forego the Pot Filler &#8212; you&#8217;re going to have to carry the heavy pot full of hot water when you need to drain the pasta anyway<br />
-    Design for a stand-alone Refrigerator – make it look built-in instead of going for the built-in model</li>
<li>Use Laminates!  I know that granite is all the rage – but laminates have come a long way since the 1950’s!  Laminates are used extensively in European-style modern cabinetry and countertops.  Using laminates can save thousands of dollars.  If you can&#8217;t live without an undermount sink, use stone just around the sink area.  Use a large stone trivet near the range.</li>
<li>Lighting  &#8211; Fluorescents have also come a long way in terms of color and function.  We can now design in quite attractive and functional fluorescent fixtures at a fraction of the cost of large areas of recessed can lights.  Similarly, fluorescent under-cabinet lights keep cabinets cooler and save money over halogen or xenon lights.  Save money by finding unusual, but lower cost, pendants for a design accent.</li>
</ol>
<p>Use the money you save to open the kitchen to the rest of the house and to the outdoors.  Create eating and sitting areas on either side of the kitchen so family and guests along with the cook visit together in comfort.  The un-fitted, lower cost kitchen remodel can make the kitchen blend seamlessly with the rest of your casual, comfortable home.  And you can relax knowing you haven&#8217;t mortgaged your soul.</p>
<div id="attachment_1149" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1149" href="http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/attachment/kingkitchen02-2/"><img class="size-full wp-image-1149" title="kingkitchen02" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/kingkitchen02.jpg" alt="kingkitchen02" width="525" height="409" /></a><p class="wp-caption-text">Stain Cabinets Instead of Replacing Them</p></div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/design-solutions/low-cost-kitchen-remodeling/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Price Drivers in Residential Remodeling</title>
		<link>http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/</link>
		<comments>http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/#comments</comments>
		<pubDate>Fri, 08 May 2009 18:18:17 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[Solutions]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1114</guid>
		<description><![CDATA[Remodeling is expensive! There's just no getting around it. There are 3 main factors that drive price: Size, Complexity &#038; Finish Level.  We'll look at each briefly and then also look at ways to minimize the effect of each.]]></description>
			<content:encoded><![CDATA[<div class="post even">
<table id="table1" style="border-style: solid; border-width: 0" border="0" cellspacing="4" cellpadding="4">
<tbody>
<tr>
<td>
<p><div id="attachment_1127" class="wp-caption alignnone" style="width: 330px"><a rel="attachment wp-att-1127" href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/attachment/pricedrivers1/"><img class="size-full wp-image-1127" title="pricedrivers1" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/pricedrivers1.jpg" alt="Size, Complexity &amp; Finish Level Determine the Cost of Remodeling" width="320" height="314" /></a><p class="wp-caption-text">Size, Complexity &amp; Finish Level Determine the Cost of Remodeling</p></div></td>
</tr>
<tr>
<td>Remodeling is expensive!  There&#8217;s just no getting around it.  There are 3 main factors that drive price: Size, Complexity &amp; Finish Level.  We&#8217;ll look at each briefly and then also look at ways to minimize the effect of each.</td>
</tr>
<tr>
<td style="padding-top: 10px">
<table id="table2" style="border-width: 0" border="0" cellspacing="5" cellpadding="5" width="100%">
<tbody>
<tr>
<td style="vertical-align: top" width="83" align="left"><span style="text-decoration: underline;"><strong>Size</strong></span></td>
<td>The cost to build an addition in the greater Washington, DC area (where I work) starts at about $200 per square foot and goes up to $350 per square or more.  The cost to remodel an existing space starts at about $100 per square foot and goes up to $200 per square or more.  So to build a 20 ft x 20 ft addition, it will cost $80,000 to $140,000.  If the addition includes a kitchen or bath (or both), it will be on the high side of that number and could be even higher depending upon the other 2 factors.  If you&#8217;re remodeling a first floor that&#8217;s 1200 Square Feet, you&#8217;re looking at $120,000 to $240,000.  Obviously, these are large ranges.  It&#8217;s the other 2 factors &#8212; complexity and finish level that determine where you&#8217;ll fit within that range.</td>
</tr>
<tr>
<td style="vertical-align: top" width="83" align="left"><span style="text-decoration: underline;"><strong>Complexity</strong></span></td>
<td>Complexity covers a lot of ground.  Kitchens and baths are complex because of the number of cabinets, plumbing fixtures and connections, appliances, surfaces (tile, granite, glass) and so on.  They will always be on the high side of the range.  For example, a basic bath remodel is a bare minimum of $15,000.  Most bath remodels are closer to $25,000 to $30,000.  High-end baths can be $50,000 to $75,000 or more.  A basic kitchen upgrade starts at about $25,000 and a remodel starts at about $40,000.  There&#8217;s no upper limit for kitchens.</p>
<p>A rectangular building is easier to build that one with angles and curves &#8212; curves are particularly difficult whether you&#8217;re talking about a wall, a deck, or a cabinet.  That&#8217;s because most building materials are straight.  Obviously, it&#8217;s easier to build a curved stone wall than a concrete, metal or wood wall.  Years ago when I was helping a cabinetmaker figure out his pricing, we determined that he needed to double his prices for curve-fronted cabinets.  Installing cabinets and plumbing is more complex &#8212; takes more steps &#8212; than just putting up drywall.  So kitchens and baths are usually the most expensive rooms in the house.  It&#8217;s less complex to tap into an existing waste line than running a new waste line, so it&#8217;s cheaper to install a new powder room directly below an existing bath than on the other side of the house.  It&#8217;s a long list, but you get the idea.</td>
</tr>
<tr>
<td style="vertical-align: top" width="83" align="left"><span style="text-decoration: underline;"><strong>Finish Level</strong></span></td>
<td>Finish level reflects the cost of the materials and the complexity of installation.  Understanding the effect of higher cost materials is straightforward &#8212; granite versus laminate countertops; stain-grade vs. paint-grade windows; hand-crafted vs. stock tile; stone vs. porcelain tile; high-end appliances versus mid-level appliances. and so on.  Complexity of installation refers to design decisions to use 3-part crown molding versus 1-part crown.  The 3 parts represent more material (and more cost) but the real cost usually comes in labor because 3-part molding takes 3-4 times more time to install &#8212; and time is definitely money in the remodeling business.  Plus finish labor is the among the most expensive labor in remodeling &#8212; finish carpenters are paid more than other carpenters and cabinetmakers are paid more than finish carpenters.  Other examples of more complex (and therefore more costly) finish choices include items such as fancy tile patterns,  multiple shower-heads, 2-sink kitchens, home entertainment systems.  These are all features that add material cost and labor cost to a remodeling project.</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td style="padding-top: 10px">But you don&#8217;t need to sacrifice your life style or a sense of luxury and quality in order to keep costs down.</td>
</tr>
<tr>
<td style="padding-top: 10px">First, square footage is overrated!  I can almost always achieve a client&#8217;s design goals within the existing footprint or with strategic bump-outs.  Second, it&#8217;s usually more comfortable and satisfying to re-purpose space rather than simply add a big addition on the back.  Think of your neighbors who have added large additions only to leave the older portions of the home empty most of the time.  Instead, you can re-purpose old spaces &#8212; maybe move the kitchen to where the dining room used to be.  And then the lot can be used to create wonderful outdoor/indoor spaces with a great sense of privacy and serenity.</td>
</tr>
<tr>
<td style="padding-top: 10px">Second, materials can be used in ways that create luxury without great cost.  In the bath, below, while the finishes look rich, the total cost of the finishes were well below 50% of the total cost (usually finishes are 60-70% of the cost of the remodel)  See Article on<a href="http://www.braitmandesign.com/blog/?p=917" target="_blank"> Controlling Costs.</a> We used the same travertine tile for all surfaces &#8212; this allowed me to get true wholesale/pallet pricing.  There are no fancy patterns or mosaic borders &#8212; keeping the cost of tile laying down.  The room is a simple rectangle &#8212; the only complexity is added by the angle of  the vanity (not shown).  The fixtures are mid-level &#8212; but well designed.  The shower has a single showerhead &#8212; a multi-function hand-held on a bar that allows it to be used in multiple ways.  We used a solid-surface shower pan rather than tile for the shower floor.  We kept and re-used<br />
existing doors and door hardware.</td>
</tr>
<tr>
<td style="padding-top: 10px">
<p><div id="attachment_1116" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1116" href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/attachment/king_mastershower/"><img class="size-full wp-image-1116" title="king_mastershower" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/king_mastershower.jpg" alt="Luxury Materials Used Cost-Effectively" width="525" height="350" /></a><p class="wp-caption-text">Luxury Materials Used Cost-Effectively</p></div></td>
</tr>
<tr>
<td style="padding-top: 10px">Imagine how much more labor-intensive it was to lay the tile in the small powder room below with all the different tiles and patterns.  While equally stunning in an understated way, the bath above, was much less labor intensive than the one below.</td>
</tr>
<tr>
<td style="padding-top: 10px">
<p><div id="attachment_1117" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1117" href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/attachment/willow_powderroom/"><img class="size-full wp-image-1117" title="willow_powderroom" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/willow_powderroom.jpg" alt="Complex Tile Patterns Add Expensive Labor" width="525" height="407" /></a><p class="wp-caption-text">Complex Tile Patterns Add Expensive Labor</p></div></td>
</tr>
<tr>
<td style="padding-top: 10px">Third, interesting and complex details can be created in less labor-intensive ways.  The wainscoting in the breakfast nook, below, uses the wall as the &#8220;recessed panel&#8221;.  We used prime 1x stock for the stiles and rails.  The ledge is simple crown with sill material on top.  This design simplified the labor and made the wainscoting detail affordable here and in the dining room.  Additional complexity was added in the home, below through the use of paint to emphasize the architecture (<a href="http://www.braitmandesign.com/blog/?p=429" target="_blank">see related article</a>).  Paint is one of the least expensive ways to add detail and complexity to a remodel.</td>
</tr>
<tr>
<td style="padding-top: 10px">
<p><div id="attachment_1118" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-1118" href="http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/attachment/basta_breakfast-2/"><img class="size-full wp-image-1118" title="basta_breakfast" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/05/basta_breakfast.jpg" alt="Effective By Relatively Simple Wainscoting" width="525" height="353" /></a><p class="wp-caption-text">Effective By Relatively Simple Wainscoting</p></div></td>
</tr>
<tr>
<td style="padding-top: 10px">So, when you&#8217;re planning a remodel, keep in mind ways to keep down costs while still adding luxury and cost-effective details.</td>
</tr>
<tr>
<td style="padding-top: 10px">All images courtesy of <a href="http://www.braitmandesign.com/" target="_blank">Braitman Design/Build</a></td>
</tr>
</tbody>
</table>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/design-solutions/price-drivers-in-residential-remodeling/feed/</wfw:commentRss>
		<slash:comments>4</slash:comments>
		</item>
		<item>
		<title>Budgeting for a Remodeling Project</title>
		<link>http://www.braitmandesign.com/home-remodeling/budgeting-for-a-remodeling-project/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/budgeting-for-a-remodeling-project/#comments</comments>
		<pubDate>Thu, 23 Apr 2009 23:25:00 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[cost of remodeling]]></category>
		<category><![CDATA[Remodeling on a Budget]]></category>
		<category><![CDATA[The Remodeling Process]]></category>
		<category><![CDATA[Working with Contractors]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1076</guid>
		<description><![CDATA[The more planning that goes into the project, the more accurately you can estimate the costs and stay within the projected cost. ]]></description>
			<content:encoded><![CDATA[<div class="post even">
<table id="table1" style="border-style: solid; border-width: 0" border="0" cellspacing="4" cellpadding="4">
<tbody>
<tr>
<td>Staying on budget in a remodeling project is pretty much like staying on budget in any other venture &#8212; whether it&#8217;s your personal budget or your business budget. The more planning that goes into it the more accurately you can estimate the costs and stay within the projected cost.</td>
</tr>
<tr>
<td><img src="http://www.braitmandesign.com/blogimages/BudgetSheet_01.jpg" border="0" alt="" /></td>
</tr>
<tr>
<td>
<p>I develop a detailed spreadsheet for my clients long before construction begins. During construction, we review the spreadsheet together as often as needed to make sure that we stay on budget. Sometimes that&#8217;s more than once a week at the beginning of the project. You can do the same thing yourself or with your contractor even if your contractor usually budgets a different way. This is can be a time-consuming process but the more you know, the more likely that you&#8217;ll stay on-track.<br />
In the first image, you can see that I track line-by-line expenses and keep a running total of the current project estimate, the cash expended and the cash remaining. Not shown is the line that shows the original budget. But you do see that I track a variance against that original budget &#8212; in this case, at essentially the end of the job, we were 1.8% over-budget.</td>
</tr>
<tr>
<td style="padding-top: 10px"><img src="http://www.braitmandesign.com/blogimages/BudgetSheet_02.jpg" border="0" alt="" /></td>
</tr>
<tr>
<td style="padding-top: 10px">I included this image, above, just to reinforce the level of detail of the spreadsheet. There are separate line items for things like cabinet pulls and cabinet knobs. While this might seem excessive, the individual $100 or $150 dollar items can add up quickly to thousands of dollars.</td>
</tr>
<tr>
<td style="padding-top: 10px"><img src="http://www.braitmandesign.com/blogimages/BudgetSheet_03.jpg" border="0" alt="" /></td>
</tr>
<tr>
<td style="padding-top: 10px">I included this next image to demonstrate the level of detail that&#8217;s included in the spreadsheet regarding cost assumptions. Notice that I list the cost of each cabinet pull as $5.00. Even at wholesale, I can spend considerably more than this or if we want to save some money here, I can go considerably lower. By including the unit price, I can give the client greater control over the individual costs as she shops by internet or in the stores. It also means that we can easily figure out whether we can absorb increases in costs in some line-items by reducing costs in other line-items.</td>
</tr>
<tr>
<td style="padding-top: 10px">Not shown are the line items for sales tax&amp; shipping, miscellaneous and contingency. Since we&#8217;re used to thinking about the price of a refrigerator or towel bar as the retail or wholesale price, I include 6% (or the appropriate sales tax rate) of the total materials costs in a sales tax &amp; shipping line item. In general, the shipping costs can fit within the sale tax line-item. No matter how much we plan, there will always be little extras that we don&#8217;t think to put in the budget. I include 2-3% of the total materials cost as Miscellaneous. And I always include a contingency line-item.The size of the contingency depends on the age of the house we&#8217;re remodeling, the uncertainties we&#8217;ve identified going in, and what I know about the clients. The costs in the contingency category are meant to include surprises and problems encountered as well as some level of new requests from the owners. Absolutely every client I&#8217;ve ever worked with asks for some changes as the job goes along. It&#8217;s often phrased as &#8220;while you&#8217;re here, &#8230;.[fill in the blank]. But it also happens because clients just can&#8217;t visualize how dramatically a remodel can change their lives for the better. And things that we suggested that they dismissed before work started now becomes a good idea after they realize the opportunity it will present. The lowest contingency I ever use is 10% for a small job that has few uncertainties. 20% to 25% is a more typical contingency figure that I&#8217;ll use for a major remodel. Clients usually go in believing that even 10% is excessive but they soon realize that I&#8217;ve saved them a lot of problems by making them budget to the higher number. If you&#8217;re doing this for the first time, you should seriously consider an even higher contingency number since you&#8217;re likely to miss cost categories as your work out the budget.</td>
</tr>
<tr>
<td style="padding-top: 10px">Copyright 2009 <a href="http://www.braitmandesign.com/" target="_blank">BraitmanDesign/Build</a></td>
</tr>
</tbody>
</table>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/budgeting-for-a-remodeling-project/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Do I Need To Hire A Licensed Contractor</title>
		<link>http://www.braitmandesign.com/contractors-contracting/do-i-need-to-hire-a-licensed-contractor/</link>
		<comments>http://www.braitmandesign.com/contractors-contracting/do-i-need-to-hire-a-licensed-contractor/#comments</comments>
		<pubDate>Fri, 17 Apr 2009 20:53:12 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[The Remodeling Process]]></category>
		<category><![CDATA[Working with Contractors]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=1020</guid>
		<description><![CDATA[Since I’m in the construction business I'm often asked about the importance of licensing.  Friends read articles that say the only way to protect oneself is to use a licensed contractor.  But the painter or handyman that’s been recommended isn’t licensed, is it safe to hire him?]]></description>
			<content:encoded><![CDATA[<p>Since I’m in the construction business I&#8217;m often asked about the importance of licensing.  Friends read articles that say the only way to protect oneself is to use a licensed contractor.  But the painter or handyman that’s been recommended isn’t licensed, is it safe to hire him?</p>
<p>Unfortunately, the answer isn&#8217;t always an easy one.</p>
<p>There are two different types of licenses in the jurisdictions in which I work.</p>
<p><span style="text-decoration: underline;"><strong>Professional Licenses:</strong></span> Professional licenses provide assurance that a licensed individual has passed knowledge-based exams and has worked a certain number of years under a licensed professional.  Most jurisdictions require that electrical and plumbing work be performed by a licensed plumber or electrician.  A registered engineer or licensed architect, in addition to passing exams and having professional work experience must also finish certain degree programs.</p>
<p>Since I am not a licensed architect, I always use a registered structural engineer to approve certain types of structural changes.  Licensing says nothing about the quality of one’s designs or ability to work with and understand the needs of clients.  I am not comfortable designing a house from scratch, I would hire an architect to work with me on this.  However, because I’ve remodeled my own houses and am responsible for the construction aspects or remodeling for others, I’m in some ways better prepared than an architect to design and manage a remodeling design/build company.</p>
<p>I will also admit that I don’t always use licensed electricians and plumbers.  I always use a licensed professional for rough-in plumbing and for upgrades to electrical service.  In addition, I always get a permit which means an inspector will review the work to ensure it meets code.  But I don’t hesitate to use a handyman or other experienced contractor to change electrical or plumbing fixtures.  In fact, for remodeling my own homes, I’ve passed an electrical exam for homeowners and done my own wiring of lighting and outlets.  An inspector will inspect my work and this is comfortable for me.  Someone less familiar with construction might only be comfortable using a licensed professional for these tasks also.</p>
<p><span style="text-decoration: underline;"><strong>Business Licenses: </strong></span> When a jurisdiction licenses a home improvement contractor, this is usually a business license and not a professional license.  The most basic protection that this type of license offers homeowners is the requirement for a certain level of general liability insurance – that level varies by jurisdiction.  In Maryland and the District of Columbia the amounts are $50,000 in property damage.  Both jurisdictions require that a company carry workers compensation insurance in case of worker injury.  In Maryland the license also requires a certain number of years of experience and passing an exam (which is testing knowledge of the laws and requirements not construction knowledge).  The District does not require this but does require copies of preprinted standard contracts.</p>
<p>So this home improvement business license basically assures the homeowner that the owner of the company has a basic level of business knowledge and a basic level of insurance.  But I carry far more insurance than is required for licensing and carry professional liability insurance as well as general and property liability insurance.</p>
<p>Importantly, Maryland also has a Guaranty Fund that can resolve claims made by homeowners should a licensed contractor fail to perform against a contract.</p>
<p><span style="text-decoration: underline;"><strong>Conclusions: </strong></span>But licensing says nothing about the ease of working with a tradesman or how conscientious they are or about the neatness of their work.  A painting company large enough to go through the licensing process may also cost more and have an owner that only checks on work periodically instead of being on the job site working alongside his crew most of the day.  My favorite painter is not licensed.  But his work and that of his crew is the best I’ve seen.  Equally important to me and my clients, he is always on time, is neat, is easy to work with, has real pride in his work and has demonstrated that he can solve problems.</p>
<p>A decision about who to hire is much more complex than determining who is licensed.  Home improvement is like most everything else we do where we need to weigh risks and benefits in making a decision.  Just remember that a professional license does assure that a contractor has a certain level of training and knowledge (but the tested knowledge is a very small segment of the knowledge-based required for executing a complex remodel).  A business license assures a certain level of business knowledge and insurance.  Neither license says anything about whether that contractor is right for your job and for working with you.  In a previous article <a href="http://www.braitmandesign.com/blog/?p=828" target="_blank">(link),</a> I’ve offered guidance about what to ask references in hiring a contractor to help answer the questions about whether the contractor has the experience based required for your job and whether he’s a good match for you.  The questions are as relevant whether the contractor is a general contractor or a painter.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/contractors-contracting/do-i-need-to-hire-a-licensed-contractor/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>You Control Remodeling Costs – (whether you Know it or not)!</title>
		<link>http://www.braitmandesign.com/home-remodeling/you-control-remodeling-costs-%e2%80%93-whether-you-know-it-or-not/</link>
		<comments>http://www.braitmandesign.com/home-remodeling/you-control-remodeling-costs-%e2%80%93-whether-you-know-it-or-not/#comments</comments>
		<pubDate>Sun, 12 Apr 2009 22:00:02 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[The Remodeling Process]]></category>
		<category><![CDATA[Working with Contractors]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=917</guid>
		<description><![CDATA[The homeowner’s decisions about finishes, appliances, and details account for more than 50% of the costs in almost every remodeling job.  ]]></description>
			<content:encoded><![CDATA[<div class="post even">
<table id="table1" style="border-style: solid; border-width: 0" border="0" cellspacing="4" cellpadding="4">
<tbody>
<tr>
<td>
<p><div id="attachment_918" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-918" href="http://www.braitmandesign.com/home-remodeling/you-control-remodeling-costs-%e2%80%93-whether-you-know-it-or-not/attachment/process_costs/"><img class="size-full wp-image-918" title="process_costs" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/04/process_costs.jpg" alt="Homeowner Decisions Drive More Than 50% of Remodeling Costs" width="525" height="383" /></a><p class="wp-caption-text">Homeowner Decisions Drive More Than 50% of Remodeling Costs</p></div></td>
</tr>
<tr>
<td>This chart represents 8 remodeling jobs my firm performed in late 2007 &amp; 2008.  The grey bars represent the percentage of the total remodeling price that went to general construction labor and materials.  This includes the price for demolition, site preparation, foundation work, framing carpentry, plumbing, electrical, and other types of purely &#8220;construction labor and materials&#8221;.  The yellow bars represent the cost of finishes and details.  This would include items such as plumbing fixtures, tile, flooring, moldings and paneling, cabinets, and the other items that make up the aesthetic decisions made by homeowners or designers.  The homeowner’s decisions about finishes, appliances, and details accounted for more than 50% of the costs in every case but two.  These discretionary costs represented anywhere from a high of 67% of total job costs to a low of 46% of total job costs.  The jobs ranged in size from $50,000 to $600,000.  And at least for these 8 jobs, there was no correlation between size and percent of discretionary costs.</td>
</tr>
<tr>
<td><img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="10" /><br />
If anything, the chart, above, understates the cost of finish decisions because often more detailed or elaborate finish decisions drives up the cost of the construction labor.  Two examples:</p>
<ul>
<li>If you&#8217;re doing a bathroom remodel and you want a shower with multiple heads, this will increase the plumbing labor costs which costs are captured in the grey bars instead of the yellow bars,</li>
<li>If the addition you&#8217;re building has a complicated roof detail or multiple skylights, the extra framing labor is also captured in the grey bars instead of the yellow bars.</li>
</ul>
</td>
</tr>
<tr>
<td style="padding-top: 10px">
<table id="table2" style="border-width: 0" border="0" cellspacing="5" cellpadding="5" width="100%">
<tbody>
<tr>
<td colspan="2">What does this mean for you?</td>
</tr>
<tr>
<td colspan="2"><img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="10" /></td>
</tr>
<tr>
<td colspan="2"><strong><span style="text-decoration: underline;">Interpreting Ballpark Quotes:</span></strong></td>
</tr>
<tr>
<td width="3%"></td>
<td width="97%">Often when you&#8217;re starting a small or even large remodeling job you bring in different contractors and talk with them about approach and costs.  You always ask &#8220;how much will this cost?&#8221;  And many contractors will give you a single number; some will give you a range.  But rarely do you really understand what the single number or range mean.   A contractor will think about how much labor and construction materials it will take and then he will often double that number to give you a &#8220;ballpark&#8221; quote.  But as you can see from the chart, above, at least in the market that I work, that will usually underestimate the price of the job.  Sometimes a contractor hungry for a job will deliberately lead you to believe that the total job will cost less by underestimating the finish decisions.  At the end he can always (truthfully) say the budget increased because you (the homeowner) chose more expensive finishes than what he budgeted.  But as often as not, the under-estimate results from the contractor valuing “good design” less than does the homeowner.  You should always ask what percentage of the &#8220;ballpark&#8221; price is represented by finishes and details.</p>
<p><img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="5" /><br />
More importantly, this type of communication fails to let you know that you&#8217;re in the driver&#8217;s seat and that the individual decisions that you make about finish and detail level determines the price of the job. Let&#8217;s look at a remodeling job where the construction labor and material costs are $75,000.  The total construction price<br />
would be $150,000 if the finishes are 50% of the final costs. The exact same remodel would be $215,000 if the choices of finishes and details are 65% of the total construction price &#8212; a difference of $65,000!<br />
<img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="10" />Finally, it means that you should never choose a contractor based on the &#8220;ballpark&#8221; price quoted.  You should however, think about whether the contractor has communicated the assumptions about finishes and detail he used in the &#8220;ballpark&#8221; he&#8217;s presented.<br />
<img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="10" /></p>
<p>I would personally rather lose work than create these misperceptions about price at the beginning of my relationship with a client. So I show this chart and then give then a &#8220;ballpark&#8221; in the higher ranges and talk about what decisions they can make during the design process to bring this price down.<img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="1" /></td>
</tr>
<tr>
<td colspan="2" width="100%"><strong>How to Interpret &#8220;Allowances&#8221;:</strong></td>
</tr>
<tr>
<td width="3%"></td>
<td width="97%">After you&#8217;ve signed a contract for a remodel but leave finish decisions to later, the contractor will put &#8220;allowances&#8221; in the contract to cover the price of the fixtures<br />
and finishes.  Often, he will include what are called &#8220;builder grade&#8221; fixtures and finishes in the allowances.  So the allowance might be for a $50 delta faucet from Home Depot but what you have in your mind is a $500 KWC special order faucet.  All these individual decisions can add thousands or tens of thousands of dollars to the final price.  And create incredible friction between the contractor and the homeowner.</td>
</tr>
<tr>
<td colspan="2" width="100%"><img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="10" /><br />
<strong>Why you should flesh-out a design before you begin construction:</strong></td>
</tr>
<tr>
<td width="3%"></td>
<td width="97%">Very few of us are indifferent to what remodeling costs.  Going over budget can permanently diminish the enjoyment you get from the changes you&#8217;ve made to your house.<br />
<img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="10" /><br />
I will not begin work on a remodel without fleshing out the design.  With a fully detailed design you can begin the process of remodeling with a very high degree of precision about the final costs.  I&#8217;m rarely more than 2% over-budget on a job.  Yes, the detailed design costs more.  But in my experience it saves money – sometimes a lot of money &#8212; in the end.  It&#8217;s much easier to control costs at the design stage than after the majority of the framing and rough in plumbing and electrical have been completed.  A detailed design can dramatically reduce the cost of add-ons.  After you&#8217;ve closed-in with drywall it&#8217;s expensive to decide to move or add a light fixture.   It&#8217;s cheap to do it at the design stage.  If the original finishes are too expensive at the design stage, then other less costly effects can be built-in to still give a sense of drama or elegance but at lower cost.  When the decision is delayed to the finish stage, the only choices are to downgrade the look or blow the budget.</td>
</tr>
<tr>
<td width="3%"></td>
<td width="97%"><img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="10" /></td>
</tr>
<tr>
<td colspan="2" width="100%">Let&#8217;s look at the 4 projects where discretionary costs were substantially greater than or were less than 50%:</td>
</tr>
<tr>
<td colspan="2" width="100%">
<table id="table3" style="border-style: solid; border-width: 0" border="0" cellpadding="4" width="100%">
<tbody>
<tr>
<td width="20%" align="right" valign="top">Project 1:</td>
<td>First Floor Remodel &#8212; 65% of the costs were discretionary finish decisions:  The primary driver of price here was custom built-ins and high-end finishes.  Another driver was that the homeowner was so excited about the changes that he added scope to include more of the residence.  We still came in on-budget because we planned for the level of detail and we included a 15% contingency based on our sense that the homeowner was vacillating about scope.</td>
</tr>
<tr>
<td width="20%" align="right" valign="top">Project 8:</td>
<td>Basement Remodel &#8212; 64% of the costs were discretionary:  The drivers here were the choice of many high-end materials and finishes.   We came in 5% under-budget because we specified all the finishes before the job began.</td>
</tr>
<tr>
<td width="20%" align="right" valign="top">Project 4:</td>
<td>Whole House Remodel &#8212; Only 47% of the costs were discretionary:  Frankly, this was a property that I was flipping.  I added drama through lower priced touches such as color palette.  I deliberately chose finishes that were attractive but low priced.  The project came in 10% under budget because we found fewer problems than expected during the remodel so less of the contingency was used.</td>
</tr>
<tr>
<td width="20%" align="right" valign="top">Project 7:</td>
<td>Master Suite Remodel &#8212; Only 46% of the costs were discretionary:  We used stock finishes in unusual ways and we used a limited palette of finishes which allowed us steeper volume savings.  The project came in 2% under-budget.</td>
</tr>
</tbody>
</table>
</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td style="padding-top: 10px">There are 3 keys factors to control of remodeling costs,<br />
-    A fully-fleshed out design,<br />
-    An extraordinarily detailed budget, and<br />
-    The appropriate contingency.<br />
The spreadsheet I use with clients literally lists every finish item that will be purchased including every single plumbing fixture, each cabinet pull, and the detailed specs for windows, doors and cabinets.  This not only forces me and my client to think through the options but will also bring up items that neither of us has thought about.  If we’re thoughtful about this process, we will come in on-budget.</p>
<p><img class="no-border" src="http://www.braitmandesign.com/images/spacer.gif" border="0" alt="" width="1" height="10" /></p>
<p>Data courtesy of<a href="http://www.braitmandesign.com" target="_blank"> Braitman Design/Build</a></td>
</tr>
</tbody>
</table>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/home-remodeling/you-control-remodeling-costs-%e2%80%93-whether-you-know-it-or-not/feed/</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>10 Questions To Ask When Selecting A Remodeling Contractor</title>
		<link>http://www.braitmandesign.com/contractors-contracting/10-questions-to-ask-when-selecting-a-remodeling-contractor/</link>
		<comments>http://www.braitmandesign.com/contractors-contracting/10-questions-to-ask-when-selecting-a-remodeling-contractor/#comments</comments>
		<pubDate>Fri, 03 Apr 2009 17:19:18 +0000</pubDate>
		<dc:creator>Jackie Braitman</dc:creator>
				<category><![CDATA[Contractors & Contracting]]></category>
		<category><![CDATA[Remodeling]]></category>
		<category><![CDATA[The Remodeling Process]]></category>
		<category><![CDATA[Working with Contractors]]></category>

		<guid isPermaLink="false">http://www.braitmandesign.com/blog/?p=828</guid>
		<description><![CDATA[This article is about what you should expect from a remodeling contractor and how to use their references to discover what you need to know before you sign a contract.  ]]></description>
			<content:encoded><![CDATA[<div class="post even">
<table id="table1" style="border-style: solid; border-width: 0" border="0" cellspacing="4" cellpadding="4">
<tbody>
<tr>
<td>
<p><div id="attachment_829" class="wp-caption alignnone" style="width: 535px"><a rel="attachment wp-att-829" href="http://www.braitmandesign.com/contractors-contracting/10-questions-to-ask-when-selecting-a-remodeling-contractor/attachment/processseries-2/"><img class="size-full wp-image-829" title="processseries" src="http://www.braitmandesign.com/blog/wp-content/uploads/2009/04/processseries.jpg" alt="A messy job site" width="525" height="394" /></a><p class="wp-caption-text">A messy job site</p></div></td>
</tr>
<tr>
<td>This article is about what you should expect from a remodeling contractor and how to use their references to discover what you need to know.</p>
<p>I told a story in last week’s article about a woman who used a contractor referred by a colleague. The project was a nightmare for her. The first couple of months went fine but then she started having problems. She would come home to find that work hadn’t been done in a way she liked. After awhile she stopped demanding corrections because she was just worn down. She was sick of having the entire house dirty and in disarray. She was constantly tripping over tools and debris. She would expect the crew on a Monday only to have them not show up for a week or more. She would have to call to discover the cause of the delay. The final insult – see last week’s story – was having to pay tens of thousands to fix plumbing, HVAC and design problems.</p>
<p>She thought she had gone through the right due-diligence having walked through projects the contractor had done and getting the referral from someone she knew. So how could she have avoided her nightmare?</p>
<p>I’ve structured the article as a series of questions to ask references and what you should be looking for in each answer. Let’s pretend that the contractor’s name is “Joe the Remodeling Contractor.”</td>
</tr>
<tr>
<td style="padding-top: 10px">
<table id="table2" style="border-width: 0" border="0" cellspacing="5" cellpadding="5" width="100%">
<tbody>
<tr>
<td style="text-align: center;" width="50">1</td>
<td><span style="text-decoration: underline;">Please describe the work that “Joe the Contractor” did for you?</span></td>
</tr>
<tr>
<td width="50"> </td>
<td>Look for similarity to your job. Do not assume that a contractor that primarily works on commercial work is familiar with residential work. Do not assume that a contractor that primarily lays tile can build decks. Do not assume that a contractor that can budget for a $40,000 job can budget equally well for a $400,000 job.</p>
<p>If all the references are for remodeling jobs that are different from the work you’re having done, ask for more appropriate references. If he can’t provide them, he doesn’t have experience doing the work you want done. He might be able to explain why the work he’s done prepares him for the work you want done, but ask and think critically about his argument.</td>
</tr>
<tr>
<td style="text-align: center;" width="50">2</td>
<td><span style="text-decoration: underline;">Was the contractor or project manager there every morning or afternoon to meet with you about progress and issues?</span> If not, who was? Was it always the same person? Did he or she have authority to direct changes and have the answers to your questions and issues?</td>
</tr>
<tr>
<td width="50"> </td>
<td>Remodeling brings daily surprises, decisions, and changes &#8211; always! Surprises come because with remodeling you don’t know what’s going on until you open up walls and floors. Decisions and changes comes because it’s rare that remodeling plans are as detailed as new construction plans. If the contractor isn’t reviewing the issues and upcoming decisions with you, then he’s using his own judgment or his crewmember is making decisions.  They can’t appreciate your preferences unless they ask. And if they’re not asking they’re often making judgments based on materials they have on hand or on efficiency. In listing to the references answers it’s OK if the meetings were by phone as long as the project manager was onsite daily to identify and resolve issues before they became problems.]</td>
</tr>
<tr>
<td style="text-align: center;" width="50">3</td>
<td><span style="text-decoration: underline;">Tell me about the items that you needed to have the contractor re-do (or wished you had him re-do).</span> </td>
</tr>
<tr>
<td width="50"> </td>
<td>In some ways this is another way of asking Question 2 but it goes more toward how decisions and issues were handled instead of who handled them. With luck, what you’ll hear from the reference is that little re-work was necessary because the contractor took the time to “mock up” or draw out the choices so you could make informed decisions. There is one of the areas where remodeling is different from new construction – a skilled remodeling contractor will help you “see” how something will look before it’s a done deal. It’s time consuming for him to re-do work and frustrating for you. </td>
</tr>
<tr>
<td style="text-align: center;" width="50">4</td>
<td><span style="text-decoration: underline;">Was there a budget surprise at the end?  </span></td>
</tr>
<tr>
<td width="50"> </td>
<td>Remember what I said about changes and surprises. The contractor should be keeping you informed of the effect on budget. If work is going over budget in some areas, the contractor should be working with you to adjust in other areas or getting your approval for the increased scope. It’s not OK to get permission for 20 separate items each of which cost under $2000 without also letting the homeowner know that the total increase is $30,000. The contractor can come back and say but you approved all these changes. The process he used still resulted in an unpleasant cost increase. You should also expect a contractor to include at least 15% and probably closer to 20-25% contingency in his budgeting. He might not call it out, but ask what he’s budgeted for contingency. In your own thinking make sure you add the contingency because I guarantee you’ll use it.</td>
</tr>
<tr>
<td style="text-align: center;" width="50">5</td>
<td><span style="text-decoration: underline;">Did the contractor have a discussion with you at the beginning of the job about the job-site rules?</span> And was it clear that all crew members and subs knew and abided by the same<br />
rules?</td>
</tr>
<tr>
<td width="50"> </td>
<td>You should expect to hear the reference say that job site rules were discussed before work began including start and stop times, use of bathroom or other facilities, who has access and how security will be maintained.</td>
</tr>
<tr>
<td style="text-align: center;" width="50">6</td>
<td><span style="text-decoration: underline;">Please describe how clean the contractor’s crew kept the job site.</span></td>
</tr>
<tr>
<td width="50"> </td>
<td>You should expect to hear that the crew cleaned up debris, moved it to a pre-approved location, vacuumed at the end of each work day to keep dust at a minimum, used drop cloths and other means to protect your furniture and flooring, used plastic walls and barriers to keep the uninvolved portions of your residence clean and protected. Dust and debris is a given with remodeling but a conscientious remodeling contractor will organize his work to keep dust and debris to a minimum.</p>
<p>You should also expect to hear that no one smoked in your home and that crew members removed any food trash and cigarette butts (from the grounds) daily.</td>
</tr>
<tr>
<td style="text-align: center;" width="50">7</td>
<td><span style="text-decoration: underline;">Did the contractor get permits from the appropriate jurisdictions? </span></td>
</tr>
<tr>
<td width="50"> </td>
<td>You should confirm that this means that permit were posted in public places, like on the front door or front windows. The contractor in the horror story said that he had gotten permits – but hadn’t. Permit must be posted. Some jurisdictions require a homeowner’s signature on a permit application including Montgomery County, MD where I often work.</td>
</tr>
<tr>
<td style="text-align: center;" width="50">8</td>
<td><span style="text-decoration: underline;">How quickly was the final punch list completed? What caused any delays? </span></td>
</tr>
<tr>
<td width="50"> </td>
<td>Every job ends up with a “punch list” of little items to fix or complete. Sometimes the delay is unavoidable such as waiting for glass to be fabricated for a shower. But in other cases,<br />
with demands from other clients, a delay might reflect a contractor’s lack of attention.</td>
</tr>
<tr>
<td style="text-align: center;" width="50">9</td>
<td><span style="text-decoration: underline;">Did you enjoy working with “Joe the contractor” and his crew?</span> </td>
</tr>
<tr>
<td style="text-align: center;" width="50">10</td>
<td><span style="text-decoration: underline;">Will you use the contractor again when you have more work to do? </span></td>
</tr>
<tr>
<td width="50"> </td>
<td>These are different questions but both are important as final measures of success. You’ll be spending a lot of time with the contractor and his crew. Even though the process is<br />
disrupting and demanding, you should enjoy the process and the individuals as much as possible. By the end of the process you should have even more trust and confidence in their skills than at the beginning.</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td style="padding-top: 10px">In the case of the horror story that started this article, when the homeowner walked through other projects all she really learned was that job involved a similar style to what she liked. The colleague who used the contractor previously had used him for a tiny job that required almost no disruption or decisions. Had she asked for more references and asked these questions she likely wouldn’t have used him. </p>
<p>In this time of economic downturn for the construction industry, more individuals and crews who have experience only in new construction are trying to get into remodeling. Remodeling and new construction are quite different and you should be extra careful in hiring crews that primarily have experience in new construction. In new construction, there isn’t furniture to protect, privacy to worry about or the morning routines and evening of the residents to respect. In new construction, you’re not working around existing components and structures so there are fewer surprises and less need to “mock-up” options or to figure out how to integrate new and old systems.</p>
<p>Finally, I really mean the part about enjoying the process. Pick the right contractor and in addition to fulfilling a dream, you’ll have fun getting there.</td>
</tr>
</tbody>
</table>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.braitmandesign.com/contractors-contracting/10-questions-to-ask-when-selecting-a-remodeling-contractor/feed/</wfw:commentRss>
		<slash:comments>3</slash:comments>
		</item>
	</channel>
</rss>
